Laserfiche WebLink
20 7.2 While parking on the frontage road is permitted in this area, the City of Roseville bans on-street <br />2 parking whenever there is 2 inches of snow or more. For this reason, on-street parking stalls <br />�22 shall not be used to meet site parking counts. The Engineering and Planning Divisions will <br />2 continue to work with AEON to ensure that adequate parking is provided on the property. <br />2,4 <br />rl <br />25 7.,j Additional study will be needed to determine if the proposed traffic calming on the public street <br />2 Ci, is appropriate for this segment of road. Any improvements to the public street would be paid <br />2 7 for and constructed by the developer. The public street plans would need to meet City standards <br />�28 for construction and restoration of the road. <br />2 ,w, <br />7.4 The parking area appears to have some very tight curves. This parking area should <br />accommodate the turning radius of Fire trucks, moving vans and large delivery trucks. <br />2 <br />7.5 Trash enclosures should be sited to ensure that a garbage truck can reach the dumpsters. It <br />appears from the angles and the orientation, that a garbage truck may have problems getting at <br />the dumpsters in the westerly parking lot. <br />1 "1 5 766 The City will work with AEON on a possible sidewalk along the Service Drive to facilitate a <br />safer pedestrian connection between residential and adjacent commercial uses, <br />3 9, <br />1 <br />kl() 767 Driveways shall meet city code or a maximum width at the property line of 26 feet, It appears <br />kl that most northwesterly driveway is wider than code allows at the property line, <br />42 <br />1) 768 Private ponding shall not be placed on City right-of-way, The pond in the northwest corner of <br />�Z�Z the site encroaches onto City right-of-way, <br />4 5 <br />'1 769 It appears that a majority of the green space for this site is being used as ponding. The developer <br />4 7 should explore alternative treatment methods such as pervious parking lots and underground <br />storage to provide some of the needed storm water management for this site, <br />50 7610 Additional discussion shall occur regarding the appropriate number and placement for fire <br />5 hydrants on the site, <br />5 2 <br />5 8.0 PLANNING COMMISSION ACTION: <br />5,4 861 On March 5, 2008 the Roseville Planning Commission held the public hearing regarding the <br />5 5 AEON request, At the meeting two area residents addressed the Commission discussion their <br />5 Ci, concerns regarding the project, <br />5 7 8.2 The Planning Commission voted (5-0) to recommend approval of the PRELIMINARY PLAT, <br />58 REZONING, and GENERAL CONCEPT PLANNED UNIT DEVELOPMENT, subject to <br />5 conditions. <br />9.0 SUGGESTED CITY COUNCIL ACTION: <br />1 9.1 BY MOTION, APPROVE the PRELIMINARY PLAT, REZONING and GENERAL <br />2 CONCEPT'PUD submittal by AEON for Har Mar Apartments, based on the comments in <br />Page 4 of 5 <br />