My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0317_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0317_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 4:21:52 PM
Creation date
12/27/2011 2:31:54 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Aff Evv;j'soti <br />Cil)) of Roseville <br />Noveritber 8, 2006 <br />Pages 3 <br />Task 2: or <br />First, the overall goals, an objectives including the activities, natural resource nianage-ment, <br />educational coniponents� and feati-ires to be included in the Nature Center will need to be <br />established dirough the Stakeholder Task Force. We blehieve that the Overall Goals and <br />Ob r ectives Workshops will be required to achieve a unified vision for the Center, <br />9 <br />Issues Workshops are also helpful in breaking down the overall vision into more nianageable <br />tasks with the appropilatie stakeholders involved. We proplose three to our Issues Workshops: <br />IQ Onejoint workshop <br />o Recreation1programming <br />C) Nature al resource enhancement <br />10 Maintenance facifily Issiles <br />After these workshops �are conipleted, the design team w,111 prepare two different master plan <br />alternatives tio be evaluated by the Stakeholder Task Force. The design altCniatives and selected <br />plan will 'be, reviewed and discussed in separate interac,tive Technical Review Workshops. <br />Throu 11 <br />Ighout each workshop, meeting agendas and minittes w*Jl e prepared to document <br />discussions and define outcomes. <br />Task 3: Con imunity Education and Outreach <br />In addition to the 'interested citizens and Stakeholder Task Force representatives, the community <br />at large needs to be info nned of the process and master plan results. We propose Nvorking with <br />the City to provide updated information on project progress via the City"s We site, FROBANC, <br />City newsletters, and, surrounding sebools to provide coverage at the draft and final plan stages. <br />We also propose a well advertised public open house to en gie the cotTmiunity and allow for <br />feedback in the process. <br />Task 4: Opinion of Probable Cost and Phasing Plans <br />After selection, of the preferred altemative we will devellop a preliminary opinion of probable <br />It <br />construction cost. Recognizing that the eilliTC plan will not likely be developed at once, the <br />master plan will pay careful attention to phasing the Nature Center improvements over a number <br />of years as funding becomes available. <br />"I'li�e phasing plan will also help prioritize improvements, such as prioritizing the natural <br />resources so oxtra money doesn't need to be spent later, to control established invasive <br />populations. This will allow the natural areas to be in better condition once trail improvements <br />are completed. <br />Task 5: Formal Presentations <br />We propose to present the Draft Master Plan for review and comment to Advisory Boards, <br />Commissions, and/or the City Council as directed by City Staff. We will also present 4he Fillat <br />Master Plans, as diTecteld for approval. <br />q <br />Task 6 , Funding anid Cram Opportunities <br />As we are experienced in l-everaging funds, for multiple park and natural resource projeds, we <br />will identify multiple grants that the City and FROHANC can pursue to allocate money for trails, <br />naft tral resource inanagement, and educational prograinis. We will provide figures and project <br />costs in assisting with grant dcvelopment, <br />■ a <br />ow <br />
The URL can be used to link to this page
Your browser does not support the video tag.