Laserfiche WebLink
. ........ . ......... . .. <br />10 <br />Park Propct Ust <br />313mwdj� ill���illi 11� <br />FUNDING NEEDS <br />I. ACORN PARK <br />Tennis Court Maintenance (Coloir Coat) <br />Tennis Court Maintenance (Full Re-construction', <br />dscape around shelter <br />Patio at shelter <br />.... . .. . . .... . . ..... <br />New Lighting at shelter <br />Gate for Shelter <br />Remove and replace storage shelter ( Wood Frame structure) <br />Shade picnic st rU ct u res, (2 @ 15, 0 0 0) <br />-- — --- - ---- <br />Disc golf improvernents <br />Field fencing (2 @ 75,000) <br />. ...... ............. <br />Arnmenitles (Benches Grilles etc) <br />- - - ------- ----- - <br />Irrigation system upgtrades (High use areas) <br />Hockey boar,ds, <br />. .... . ................. <br />. ...... . ... . ......... ......... . ... ... <br />Material Bin <br />Equipment Storage Boxes, <br />Sign Planting Areas <br />2. A,p,plewolod Overlook <br />Arnmenities, <br />Sign Planting area <br />3. Applewood Park <br />Play Eq <br />Sign Planting Areas with Irrigation <br />........ ... <br />4. Aulturrin Grove Park <br />Master Pla ni <br />Tennis Court (Color Coat) <br />Tennis Court (Full re- construct <br />New Shelter <br />--- -- ---- . . ......................... — <br />Re-construct fields with (lighting (2-Irrigated Soccer Fields) <br />Parking lots <br />. ... . ........... ... .. . .. . ....... <br />Play equipment upgrades (New concrete curb etc,) <br />Irrigation in high use areas <br />Loop pathway <br />Shade picnic structures (2 @ 15000) <br />---- --------------- <br />Hockey Boards <br />Sign Planting Areas with Irrigation <br />. . ..... . ....... <br />Plaza area <br />Equipment Storage Boxes, <br />Attachment 6 <br />Immediate �Future Total <br />. ...................................... . <br />25,0100,001 <br />150,000,00 <br />20,000 00, <br />....... . . .. . . ...... . <br />25,000,00 <br />$ 10,000m <br />. . .... .................... <br />$ 101,000M <br />$ 100,01 00,00 <br />...... . . . ....... _-, <br />$ 30,000,00 <br />$ 201000.00 <br />. ........... . ..... . . . . . ............. . .... . . 1 $ . ......... . <br />$ 5'omoo <br />. . . ........................... <br />$ 30,,000.00 <br />1 0,1000.00 <br />$ 5,000.00 <br />�, j .... ........ . ....... <br />$ 2,000.00 <br />$ 15,000.00 <br />f: 7 DAr <br />3010�00'0,0' r. <br />. ........ . JJ <br />. .. . ..... . ........... <br />10,000.00 <br />$ 51000.00 <br />. . .. . ......... . .. ... . <br />$ 60,000,00 <br />............. . . . ................................ . . ...... . . ..... . — <br />$ 151000,010 <br />.............. <br />. ..... . .. . . . . ............... <br />$ �20,000,010 <br />. ......... . . ........ . ....... <br />$ 10,000,00 <br />100,000r00 <br />. ......... . ................. <br />$ �400,000,00 <br />. . . . ................................ ................... <br />$ 3�50,000,,00 <br />150,000"001 <br />25,000.00 <br />. . ............ <br />25,0001,00 <br />310,000.0�O <br />. .. . . .. ..... . . . .............. <br />$ 30,000,010 <br />. . ........... <br />$1 10,000.00 <br />$ 20,000.00 <br />$1 25,000.GO <br />. . ...... . . ....... . ............ .................. <br />$ 11000.00 <br />I 010� 000 "Do" <br />Rifwll' <br />Page 30 <br />