|
5. B-Dalle Fields
<br />. . ............. ........................................ .
<br />Fencing $ loo ,goo
<br />=
<br />. ........ .......... ............. . .............. . . ........... . ....................... . .......... . . . .. .... . . . ... .. ......
<br />Bleacher pads $ 107000.00
<br />Player benches $ 5,000.00
<br />. . ...... .... . ....... . ..... ..........
<br />Field Maintenance, (Fill OF low areas, re-do infield and warn. Tr $ 12,,0010. 00
<br />........... ..... ... .........
<br />B-Dale Bocce Ball $ 610010.00
<br />. ..... .. ..........
<br />Material Biin 6,1000.00
<br />. . . ..... . . .. .. . ........ . .... .
<br />Equip�ment Storage Boxes 1,000.00
<br />tookoo,
<br />6. Bruce, Russell Park
<br />Tennis Court Reconstruction and lighting $ 100,000.00
<br />. . . . ...... . ......... .... ....
<br />Pllgrundl Eq, 1 7�5,000,00
<br />. . ................ . .......
<br />,Shade Structure $ 15,0010.00
<br />Gate in courts $ 5,,000.00
<br />a . ............. .
<br />Equipment Storage Boxes $ 11,000.00
<br />Ig 'g
<br />7
<br />ffi '6,00obo',
<br />7., Central Park Dale West (Athletic C=pllex)
<br />Picnic/Cioncession Building
<br />Parking lot upgrades 50,0100�00
<br />Fence 601,0100.00
<br />Sidewalk $ 40,000-00
<br />. ......... ........... . .......................... .... .... . . . ....... .
<br />Lighting $ 100,000.00
<br />. . .............................. -
<br />Landscaping $ 20,000.00
<br />. . . . . ...............
<br />Playground $ 100,0�00.00
<br />. . . . . .................................... . ................. . .......................
<br />Plaza Area j 50,000m
<br />. . . ...............
<br />Irrigation for high use areas, $ 35,000.00
<br />. ................. . ................. . . . ................
<br />Bridge $ 40,000"00
<br />. ...... ........... . ............. . .... . . .... . ........................ . ....... . . ...............
<br />-Kiolsk $ 15,000.00 . ........ ..... . ........
<br />West Sign planting area with Irrigation $ 20,000-00
<br />. . ..... . ............
<br />Material Bin 5$000,00
<br />....... . .. . ....... . ........ ...... .
<br />Equipment Storage Boxes
<br />2,1000 .00 ✓
<br />"Ri
<br />7. Central Park Lexington (Including West area)
<br />......... . ...... . .... . . . .. ..........................
<br />.. ...... .......... ......... ....... . . -
<br />Master Plan $ 501,000.00
<br />... . ........
<br />CP Entrance Plaza and Restroom Renovation $ 6001000,00
<br />............... . .... . ... . .... ... . . ..
<br />CP Amphitheater and Lake Imps ovements $ 350,000,,00
<br />. . . ...... .
<br />Bennett Lake Lighting $ 350,000.00
<br />................... ....... ........ ..
<br />Natural resource restoration, $ 200,000,00
<br />. ..... ..... . .......... .... ... . ......... . .....
<br />Amenities $ 501,000.00
<br />....... . . . ...... .
<br />Bocce Ball Court re-construction $ 25,0100, 01
<br />Foundation Shelter $ 250,000,00
<br />Playground Eq (2 @ 80,000) 160,000,010
<br />. . . . ... . ... ................. ... ........... —
<br />Pathway Improvements 80IK000,00
<br />. . . . .. ........ ............
<br />Irrigation at high use areas $ 50,000,00
<br />........... . ..... ..... . - - - -------
<br />Kiosks (2) $ 30,000.00
<br />----------- - -------
<br />Amenities $ 20,000.00
<br />. ..........
<br />,Shade s tructures, (5) $ 601,000,001
<br />Volleybafl Courts (East Side) $ K000.00
<br />. .. .............. . .....
<br />West Sign planting area with Irrigation $ 20,000,,00
<br />. . . .... . .. . ..... ...... .... ...
<br />Material Bin $ 5,000.00
<br />
|