My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0114_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0114_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 4:16:04 PM
Creation date
12/27/2011 3:03:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONCONSULTING G*Roup,, IN'ic,. <br />E NGINEERS I �P LANNERS I D ESIGNERS <br />MEMORA�NDUM <br />MINTNCAPOLIS <br />FA RG 0 <br />MADISON <br />V* <br />T0-10� Debra Bloom, P.E., Assistant Public Works Director/City Engineer <br />C1`1%Y OF RoSEVILLE <br />FROM: Craig Vaughn, P.E., P.T.O.E., Associate <br />DATE: December 3, 2007 <br />SUBJECT: H. MAR SHOPPING CENTER TRAFFIC STUDY REVIEW SUPPLEMENT <br />As requested, we have completed a review of Went Associates Supplemental Traffic Review for <br />Proposed Outlot 81 Concept PUDfor Har Mar Shloppilng Center dated November 15, 2007. The <br />purpose of this mlemoriandum is to' further communicate our position regaraing closure of the <br />right-lout access into County Road B between Snelling Avenue and the Har Mar Northeast <br />Access. <br />.1111111 �1 <br />, � ALI :vli, OMMAIW <br />z - 21-, ''' T * <br />In our Har Mar Shopping Center Traffic Study Review memorandum dated October 29, 2007, <br />SRF recommended the closure of the right -in/right-lout (RIRO) access onto County Road B <br />between Snelling Avenue, and the Har Mar Northeast Access. This was further substantiated by <br />our recommendation to condition the concept PUD approval based on the applicant agreeing to <br />close this access,. The City of Roseville modified. this recommendation from a complete access <br />closure to a partial closure, restricting the existing access to a right-in only. <br />Much of this disc ussio''h is due to the occurrence ,of u- errs at the signalized intersection of <br />,County Road Bomar Mar Northeast Access. There are existing restrictions on the time of day <br />that u-turns are allowed at this intersection, U-tars are restricted from I I a.m. to I p.m. and <br />4 p.m. to 6 p.m., Monday through Friday. Certain developments on the north side of County <br />Road B rely on this u-turn movement for a portion of their customers to gain access. Patrons of <br />the Har Mar Mail have alternative access for egress at the south leg of the County Road B/Har <br />Mar Northeast Access signalized intersection. <br />www.srfconsulting. com <br />One Carlson Parkway North, Suite 150 1 Minneapolis, MN 554474443 1 763.475.0010 Faw 763A75.2429 <br />An Equal Opporharity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.