Laserfiche WebLink
I Iq <br />_U1 <br />(ATTACHMENT) <br />September 7,, 21007 <br />ou,tlot builiding along Cty, Rd. B with a, new building/tenant, along with associated <br />parking lot', improvements. Approval of the PUD amendment will clear the way <br />for finalizing agreements with eager tenants., <br />Traffic-, <br />A traffic. study 'is currently underway which will take into account the planned <br />MND,OT turn lanes <br />• Snelling and compare the traffic generated by previous <br />anchor tenants with the traffic generated by anticipated anchor tenants. The <br />entrance opposite Target will be designed and re-adjusted 'If/as necessary. <br />Park* <br />The current angled parking in the cast parking lot is pro pose to be re-striped to <br />90 degree parking to simplify traffic flow within the development and 'increase the <br />total amount of parking stalls within the site. The east lot is anticipated to be re <br />stripe. concurrent with the outlot development* <br />Survo: <br />E Isto <br />x ing surveys for the Harmar property are presently a collection of hand-drawn <br />and electronically drawn (CAD) pieces. A comprehensive effort i s currently <br />undierway to survey the entire Harmar property on CAD. The survey must be <br />completed to proceed with required civil engineering efforts. <br />Existing PWosed <br />Net Site Area 1,820,911 sf. 1, , 1. 1 sf. <br />Gross Lieaseable Area 433,730 sf. 433,542 sf <br />F/A Ratio 23.82 23.81 <br />