My WebLink
|
Help
|
About
|
Sign Out
Home
2008_1110_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_1110_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:47 PM
Creation date
12/28/2011 9:31:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POLICY OBJECTIVE <br />The engineering and administration for this project is eligible f i <br />or Federal funds. The City s <br />1� designing this project with city staff. In order to receive reimbursement for the engineering 3 9 and <br />32 administrative time necessary to design this project, the City needs to execute the attached <br />3 1 3 Agency Agreement. <br />FINANCIAL IMPACTS <br />35 Federal aid is a reimbursement program. Federal funds cannot be released until after an expense <br />36 has been incurred. Mn/DOT then reimburses such expenditures with federal funds. This is very <br />37 similar to the process that we use for State Aid Projects. What follows is the estimated budget <br />38 for this project. The agreement covers the following line items: DCP Documentation, <br />Preliminary Project Design, Plans and Specifications, and Education Campaign. Total estimated <br />'41"), cost for these items: $141,000. <br />Program Management <br />DCP Documentation <br />$359000.00 <br />Construction Management <br />$659000.00 <br />$ 10 0 9 0 0 0. 0 0 <br />Planning and Pre-Design <br />Preliminary Project Design <br />$60,000.00 <br />$ 6 0 9 0 0 0. 0 0 <br />Preliminary Engineering <br />Plans & Specifications <br />$369000.00 <br />$ <br />Construction <br />On- road bicycle lanes <br />$1509000.00 <br />Off- road pathway <br />$6009000.00 <br />Drainage improvements <br />$759000.00 <br />$ 8 2 5 9 0 0 0. 0 0 <br />Installation and Furnishings <br />Bike Racks <br />$129000.00 <br />Street Trees <br />$209000.00 <br />• <br />$159000.00 <br />$ 4 7 9 0 0 <br />Education and Promotion <br />Education Campaign <br />$109000.00 <br />$109000.00 <br />Grand Total <br />$190789000.00 <br />,42 STAFF RECOMMENDATION <br />4, , 3 Adopt resolution approving an agreement between Mn/Dot and the City of Roseville for Federal <br />A� z<� Participation in Preliminary Engineering for SP 160-091; MP NMTP 6209(117). <br />,"15 REQUESTED COUNCIL ACTION <br />,"16 Adoption of a resolution approving an agreement between Mn/Dot and the City of Roseville for <br />17 Federal Participation in Preliminary Engineering for SP 160-091; MP NMTP 6209(117). <br />Prepared by: Debra Bloom, City Engineer <br />Attachments: A: Agreement No. 93491 <br />B: Resolution <br />OEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.