My WebLink
|
Help
|
About
|
Sign Out
Home
2008_1020_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_1020_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:48 PM
Creation date
12/28/2011 11:35:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB & Associates, In <br />Proposal BL-08-0238 <br />October 9, 2008 <br />Page 5 <br />,Servicle Uescription Cost Estimate <br />Soil, Brings $10.300 <br />Utility Clearance and Staking $725 <br />Laboratory Testing $ 1.,,240 <br />Management, Sample Review.. Engineering and Report Preparation $4,655 <br />Geotechnical Subtotal '16 92 <br />Preliminary Environmental Evaluation <br />IField Screening and Sample Collection $ 5J00 <br />(includes technician, vehicle, and field screening iequipiment) <br />Laboratory Anallyses — Sall Samples $4,000 <br />(see Scope of Services for details) <br />Project Coordination, reporting, and a meeting with C'I'ty/MPCA $3,500 <br />Environmental Subtotal 11.34 <br />Estimated Pr9j get ,Total 30,120 <br />► IN 0 <br />Braun Intertec appreciates the opportunity to present this proposal to you. It is being presented in <br />duplicate so if it is acceptable, the original can be retained for your records and the copy can be <br />s i I R & <br />Yned and returned to us electronically, byfox, or U,,S,, Mai i its'entirety, including the General <br />Conditions, as written authorization to proceed. We 'will begin the project upon receipt of your <br />authorization. <br />The estimated cost of $30,,120 presented in this proplosal is bald on the scope of services described <br />and the assumption that the proposal will be authorized within 30 days and that the project will be <br />completed within the proposed schedule. If the project is not authorized within 30 days., we may need <br />to modify the Iproposial. If the project cannot be completed with,in the proposed schedule due <br />to circumstances beyond our 1control, revising the proposal may be required for completion of the <br />remaining tasks. <br />ffl,, U <br />
The URL can be used to link to this page
Your browser does not support the video tag.