Laserfiche WebLink
8 7.0 PROJECT SPECIFICS <br />69 7.1 PHS proposes to add about 30,000 square feet of building area to the existing 24,000- <br />70 square-foot structure for a total of about 54,000 square feet. The addition will include <br />711 new office space as well as employee training and fitness facilities; the overall floor area <br />72 by use breaks down as follows: <br />73 Use ........................................................... Approx. floor area <br />74 Office ................................................................ 20,000 sq. ft. <br />71") Training rooms .................................................... 4,200 sq. ft. <br />76 Wellness center ................................................... 2,500 sq. ft. <br />77 Staff dining/conference/misc. resource areas... 11, 500 sq. ft. <br />78 Storage, lobby, restrooms, halls, etc . ................ 15,800 sq. ft. <br />79 Total ................................................................. 54,000 sq. ft. <br />8o 7.2 Modifications to the parking area within the office property have been proposed which <br />811 reroute some of the drive aisles but which maintain the existing setbacks from the <br />82 adjacent roadways and continue the contiguous connection with the parking area on the <br />83 shopping center property. <br />84 8.0 DEVELOPMENT REVIEW COMMITTEE COMMENTS <br />81") In addition to being generally supportive of the proposed office expansion, the I had <br />86 the following comments: <br />87 8.1 Public Works staff indicated that an AD - compliant sidewalk connection would be <br />88 required between the main entrance and Centennial Drive and that this is to be <br />89 accomplished by extending the proposed sidewalk north along the western end of the <br />90 existing building. <br />gii 8.2 Public Works staff has no concerns about the ability of the existing roadways to handle <br />92 the additional traffic generated by the expanded office facility and has determined that no <br />93 formal traffic study is necessary. <br />94 8.3 A permit from the Rice Creek Watershed District will be necessary, but this is part of the <br />95 normal course site permitting and need not be a part of the GENERAL CONCEPT PUD <br />96 approval. <br />97 8.4 Many of the I members have some aesthetic concerns about the trash handling <br />98 facilities in the proposed location along Hamline Avenue, but they acknowledge that it is <br />99 likely the best place since it is also the current location of electrical equipment and utility <br />1100 service. While the proposed service vehicle turnaround eliminates any concerns about <br />11011 traffic conflicts and vehicle movements, there were concerns about the effect of noise on <br />1102 the residential uses across Hamline Avenue, but PHS staff has since indicated that trash <br />1103 handling equipment would be entirely enclosed within the building and would only be <br />1104 collected twice a week, so the impacts of noise should be minimal. Staff recommends <br />110 11,15 requiring the installation of additional landscaping on either side of the service vehicle <br />1106 access between the turnaround and the Hamline Avenue sidewalk and limitation of trash <br />1107 collection hours as part of the PUD Agreement. <br />1108 8.5 Because the shopping center and office properties are both under PHS ownership, the <br />1109 proposed 2-foot setback from the southern side property line is not an immediate <br />PF08-024—RCA-072808.doc <br />Page 3 of 6 <br />