Laserfiche WebLink
2009 — 2018 Capital Improvement Plan <br />Public Works <br />Sanitary Sewer Utility <br />Lift Station replacement and upgrades <br />The City sanitary sewer system operation <br />requires dependable lift station pumps, control <br />systems, and monitoring equipment for <br />emergency response for citizen heath and <br />safety and prevention of property damage due <br />to sewer flow backup. Replacement of <br />operational equipment at the end of its useful <br />life is critical to providing uninterrupted flow of <br />wastewater from homes and businesses to <br />regional treatment facilities. <br />Supports systematic programs for equipment <br />replacement to ensure uninterupted system <br />operation <br />Annual budget and sewer rate <br />recommendation to reflect cost of lift station <br />equipment replacement based on <br />depreciation schedules and annual review of <br />equipment needs schedule. <br />Added 5 years to CIP. Adjusted capital needs <br />to reflect projected capital replacement <br />wt <br />