Storm Sewer <br />Encourage (or require) more on -site storm water treatment to lessen the overall costs, and <br />impacts,. This will provide an incentive for each developer to lessen their cost share of <br />storm sewer needs,. <br />• All runoff from contributing sub - drainage areas, is directly proportional to the area of the <br />developing block. <br />• Assign total cost of design and construction to all benefiting blocks, as a percentage of <br />each block compared to the entire Twin Lakes, AUAR area. <br />• All cost of utilities, outside of the street right-of-way as,s,umed to be paid by each <br />respective developer. <br />VJMM iv, <br />• Replace the existing CIP on Prior Avenue with 12" DIP. <br />• Extend an 8" water main to CR C2 from Twin Lakes, Parkway termini. <br />• A 12" water main on Twin Lakes, Parkway was assumed to provide service to the area <br />and maintain service pressure to the supply along Prior Avenue. This supply line will <br />provide the City the necessary redundancy for the water system. <br />• Anticipated water demand is well below the "worst -case" daily water demand in the Final <br />Twin Lakes, Bus,ines,s, Park AUAR Update dated October 15, 2007, table 13.1. <br />• Service connections, not shown were assumed connected to existing water mains,. <br />• Hydrant spacing was assumed at 3 '. <br />• Extrapolated as,s,umptions, to other subareas, as applicable. <br />• Assign total cost of design and construction to all benefiting blocks, as a percentage of <br />each block compared to the entire Twin Lakes, AUAR area. <br />• All cost of utilities, outside of the street right-of-way as,s,umed to be paid by the developer. <br />It should be noted that the concept design as,s,umptions, detailed above do not represent a detailed <br />modeling analysis,. As parcels, or blocks, begin to develop within the Twin Lakes, redevelopment <br />area, detailed modeling analysis will be needed to determine specific final design computations,. <br />Attachment D includes, Table 5, which presents, line item estimates, for each public utility based <br />on subarea I needs, (based on our review of previous, preliminary design materials,). As <br />previously stated this information was extrapolated to determine the cost allocation for all of the <br />Twin Lakes, redevelopment area. <br />Table 4 shown below displays, the public utility cost allocation for the Twin Lakes <br />redevelopment area. <br />City of Roseville Twin Lakes AUAR Area <br />February 2008 Infrastructure Improvements <br />Page 9 <br />