Laserfiche WebLink
ARTICLE 1.1 INITIAL INFORMATION <br />§ 1.1.1 This., greement is based on the following information and assumptions. <br />(Note the disposition for the follolving iteins by inserting the i�e-qttieis, red 'itifbli-i ati,oii, or a statemient such as "nii <br />applicable, " "unk7iown at thne of execution " or "to be de'tet-nfin.ed later by inuituiail algreeineinit. <br />§ 1.1.2 PROJECT PARAMETERS <br />§ 1.1.2.1 The objective or use is: <br />(Identify or describe, if appropriaie, proposed use or goals.) <br />Scope of or <br />Descriptim <br />a Conceptual design of campus wide geothermal system <br />B Detailed analysis of existing equipment including fife expelictanicy <br />a Phasing Plan based on the equipment analysis <br />Preliminary construction cost estimates for each phase <br />Potential payback s for each phase based on energy savings and current energy costs <br />Feasibility Study of City campus to incorporate geotherinal system. <br />§ 1A.2.2 The physical parameters are: <br />(Identify or desciibe, if appropilate, si.,,,,e, location, diniensions, or other pertinent pia fibnnialion, such as geotechnical <br />reports about the site.) <br />§ 1. 12.3 The Owner's Program is: <br />(Identify documentation or state the inanner in which the prograin will be developed.) <br />§ 1,11.2.4 The legal parameters are: <br />(Identify pertinent legal infonnation, including, if appropriate, land surveys and legal descriptions and restrictions <br />of the site.) <br />(Paragraphs deleted) <br />§ 1.1.2.6 The time parameters are: <br />(Identify, if appropriate, milestione dates, durations or fast track scheduling.) <br />Feasibility Study will track with the prelin-Anary design of the lice Rink as information fri►rn the Rink is required for <br />the Study. <br />§ 1.1.2.7 The proposed procurement or delivery method for the Project is: <br />"Identify inethod such as competitive bid, ne gotiated contract, or construction inanageii-nent.) <br />No construction. I <br />§ 1.1.2.8 Other parameters are: <br />(Identib, special characte ristics or needs of the ,fro ect such as energy , eni�iiirionipnental or histo, Hic p irese t vation <br />requirements.) <br />§ 1.13 PROJECT TEAM <br />§ 1.1.3.1 The Owner's Designated Representative is: <br />(List naine, address and wher information.) <br />AIA Document B141 TM- 1997 Part i. Copyright 0 1917, 1926, 1948, 1951 o I - 953, 1 19 1 5 11 81 119161 , 1963, 1966, `1967,119701, 11974, 11977,111987 and 1997 by The <br />American Institute of Architects. All rights reserved. WARNING* This AIA it Document is protected by �U.S. Copyright Law and International Treaties. <br />unauthorized reproduction or distribution of this AW Document, or any portion of it, ima yriesult IIn sever e civil and criminal pilenialties, and will be <br />prosecuted to the maximum extent possible under the law. This document was �produced by A,IA sciftware at 07:41,2119 on 012/0512008 under Order <br />1 vuhinh PyPires an 11/5/2008. and is not for resale. <br />,Nlo.1,10.0.0327492 I <br />User Notes: <br />