Mr. Bill Malinen
<br />City of Roseville
<br />2660 Civic Center Drive
<br />Roseville, TMN 55113
<br />§ 1.1.3.2 The persons or entities, in addition to the Owner's Designated Representative, wbio cure required to review
<br />the Engineers subn ttals to the Owner are:
<br />(List naine, addre ss and other iriforinaiion,)
<br />§ 11.3.3 The Owner's other consultants and contractors are:
<br />(Lis l discipline and, if knoivn, identaty thein by naine an.d address.)
<br />§ 1.1.3.4 The Engineer's Designated Representative is:
<br />(List nai7ie, address and other inforination.)
<br />Karges-Faulconbridge, Inc.
<br />Mr. Randy P. Christenson, P.E.
<br />670 West County Road B
<br />St. Paul, MN 55113
<br />§ 1.1. 3,5 The consultants retained at the Engineer's expense are:
<br />(List discipline and, if kno-",,n, identifi7 theirs by name and address.)
<br />Geo-XeTgy Systems, Inc.
<br />Mr. Roger Taliotis, P. Eng.
<br />12 Erinbrook Drive
<br />Kitchener, ON Canada N213 2X4
<br />S, 1.1.4,Other important initial information is:
<br />§ 1.1.5 When the services under this Agreement include contract administration services, the General Conditions of
<br />the Contract for Construction shall be the edition of AIA Document A2101 current as of the date of this Agreement,
<br />or as follows:
<br />§ 1.1.6 The information contained in this Article 1. 1 may be reasionably relied upon by the Owner and Engineer in
<br />determining the Engineer's compensation. Both parties, however, recognize that such information may change and,
<br />in that event, the Owner and the Engineer shall negotiate appropriate adjustments in schedule, compensation and
<br />Change in Services in accordance with Section 1.3.3.
<br />ARTICLE 11 RESPONSIBILITIES OF THE PARTIES
<br />§ 1.2.1 The Owner and the Engineer shall cooperate with one another to fulfill their respective obligations under this
<br />Agreement. Both parties shall endeavor to maintain good working relationships among all members of the Project
<br />team.
<br />1.2.2 OWNER
<br />1.2.2.1 Unless otherwise provided under this Agreement, the Owner, shall, provide information in a timely manner
<br />regarding requirements for and limitations on the Project. The Owner shall furnish to the Engineer, within 15 days
<br />after receipt of a written request, information necessary and relevant for the Engineer to evaluate, give notice of or
<br />enforce lien rights.
<br />AAA Document B141'Tm-1997 Part 1. Copyright@ 1917,1926$19481 1951,1953, 1�58�� 91 �, ��������,�� 61,1119167, 170, 17, 1 �977 191&an9e
<br />nit. r g American Institute of Arch[tects. All rights reserved. WARNING: This Ate Documnt prot y U�,S. Colpy� 11 �ht Law and Intiernational Treaties.
<br />Unauthorized reproduction or distribution of this Ale Document, or any, portion of it, imay riesult in severe civil andl criminal penatties, and will be
<br />prosecuted to the maximum extent possible under the law. This document was produced by AIA software at, 07:41:29 on 02/0,512008 �under Order
<br />Nlo.1000307AOO I which expires on 11/512008i and is not for resale.
<br />User0 %r K. 0
<br />% Notes: (4 33441425)
<br />
|