My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0225_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0225_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:50 PM
Creation date
12/29/2011 8:38:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />ENGINEERS w ARCHITECTS P PLANNERS 444 C'ed'ar Street, Suite 1500 <br />Saint PaO MN 55101-2140 <br />(651 ) 2924400 <br />(61511) 292-0083 Fax <br />tv w w. t k d a. c o in <br />February 21, 2008 <br />Mr. Duane Schwartz <br />Public Works Director <br />City of Roseville <br />2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />Re Revised Proposal for Engineering Services <br />2008 Watermain Lining Project <br />City of Roseville, Minnesota <br />Pursuant to communications with you, we are pleased to submit this Proposal to, provide <br />Engineering Services for the 2008 Watermain Lining Project,. Our services, will ble provided in <br />the manner described in this Proposal subject to the terms and conditions set forth in the attached <br />"General Provisions of Architect Engineer Agreement" dated October 1199,31. Hereinafter,, the <br />City of Roseville 'is referred to as the OWNER. <br />. . ............... ...... . <br />This Project includes the preparation of Contract Documents, including plans and specifications, <br />in connection with the 2008 Waterman Lining Project in the City of Roseville, Minnesota. This <br />I <br />Project includes the installation of a polyester-reinforced piolyiethylenip structural liner into, older <br />existing watermains. The locations 'Included in the Project are: <br />0 "'tratermain East of Churchill Street, from Wolodhill Drive to, County Road C-2 <br />TKDA will coordinate the work for this Project to be concurrently bid and constructed together <br />with the watermain lining work from several cities in an effort to lower the overall construction <br />costs through an economy of scale. <br />An Employee Owned Company Promoting Affirmative Action and Equal Oppotfunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.