My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0225_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0225_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:50 PM
Creation date
12/29/2011 8:38:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"'SAM a a <br />J �TA 0 W <br />Memo <br />I To: Mayor and City Council members <br />2 CC: Bill Malinen , Manager; City I <br />3 Duane Schwartz,, Public Works Director <br />4 From Debra Bloom,, City Engineer <br />5 Date: February 15, 2008 <br />6 Re: Twin Lakes RedevelODment Area Cost Allocation Study <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />At the Monday, February 11, 2008 meeting we presented to the City Council the Twin Lakes <br />AUAR Area Infrastructure Improvements Draft Final Report. During the meeting we received <br />the following questions from the City Council.- <br />Q• How are pedestrians being addressed as a part of the concept plans? Is there a sidewalk <br />included as part of the Fairview Avenue improvement? <br />Sidewalk extensions are included in the concept drawings for the followin improvements.* <br />Imp <br />Figure <br />Location <br />3 <br />5 <br />Snelling Avenue and County Road C2 <br />5 <br />7 <br />Cleveland Avenue and 1- W Northbond Ramps <br />6 <br />8 <br />Cleveland Avenue and County Road C2 <br />7 <br />9 <br />Cleveland Avenue and County Road D <br />9 <br />11 <br />County Road D and Fairview Avenue <br />10 <br />12 <br />Fairview Avenue and Lydia Avenue <br />11 <br />13 <br />Fairview Avenue and Terrace Drive <br />12 <br />14A&B <br />County Road D - Segment <br />13 <br />15A&B <br />Twin Lakes Parkway - Segment <br />14 <br />16 <br />Prior Avenue (South of Twin Lakes Parkway) - Segment <br />15 <br />17A&B <br />Prior Avenue (North of Twin Lakes Parkway) - Segment <br />16 <br />18A&B <br />Fairview Avenue - Segment <br />• How does this physically impact adjacent property owners (Fairview)? <br />Each of the concept drawings show the right- of- way and parcel lines. Additional right- of- <br />way purchase will be necessary in places where the proposed improvements cross outside of <br />the right- of- way. Attachment B to the report contains the Cost Estimate. Estimated right- <br />of- way costs are included in lines 3 & 4 of Miscellaneous costs. <br />The concept drawing for Improvement 16.- Fairview Avenue (Figures 18A & 18B) show the <br />conversion of Fairview Avenue from a two lane rural road to a 3 lane urban road with a <br />sidewalk. The existing street is 40 feet wide. The urban 3 lane road as shown in the concept <br />is 46 feet wide. The Fairview right- of- way varies in this corridor between 76 and 86 feet <br />wide. The proposed sidewalk along the east side of the road is 6 feet wide with a 6 foot <br />boulevard. The proposed improvement widens the street within the right- of- way by 6 feet, <br />
The URL can be used to link to this page
Your browser does not support the video tag.