Laserfiche WebLink
and adds a sidewalk. There are three lots where 2 feet of right- of- way will need to be <br />purchased to construct the sidewalk. <br />o Can the concepts be changed? How much flexibility is there with development proposals <br />that come forward in the future? <br />The drawings as shown in the report are concepts only, they will need additional design to <br />come up with the final construction drawing. It is not anticipated that these projects will <br />occur without a public process. It is Public Works Department Policy to go through a public <br />information process for all construction projects; this usually consists of 2 or 3 public <br />meetings prior to the project being constructed. It is also assumed that these improvements <br />will not all happen immediately. They would only occur when the traffic being generated <br />by a development proposal diminishes the level of service for the identified segments of the <br />roadway network. <br />The intent of the Study was to determine the costs to implement the infrastructure <br />improvements identified in the Mitigation Plan show on pages 59-65 of the AUAR. This <br />mitigation plan is the City's commitment to address potential adverse environmental impacts <br />due to the development in the Twin Lakes AUAR area. The layout of the improvements; <br />(i.e. the number of lanes, length of turn lanes, additional signals, etc.) are consistent with the <br />mitigation plan approved by the City Council in the AUAR. <br />As proposals come in they will be required to complete a separate traffic analysis that details <br />how that proposed redevelopment impacts the Twin Lakes AUAR mitigation plan. The <br />main objectives of that analysis study are as follows.- <br />• Evaluate the traffic impacts at adjacent intersections <br />• Recommend improvements necessary to support the proposed development <br />• Review the recommended improvements in the context of the overall Twin Lakes <br />AUAR area <br />• Review the proposed development's proportional cost allocation for future <br />infrastructure improvements <br />• Review the proposed site plan and access <br />o Can the costs be assessed or assigned down the line? A PIT agreement will be executed for <br />all parcels impacted by the Report. If TIF is requested, there will also be a development <br />agreement for each proposal. Staff anticipates that the manner of collecting the costs to <br />implement the mitigation plan would be described as a condition of these agreements. <br />Options are to collect them up front,, or collect them as projects are constructed. <br />o Could we develop a policy framework document that would detail the implementation of the <br />Study? Staff agrees that this should be developed to help clarify how the study will be <br />applied as developments come in. <br />We will bring this study back to the City Council at the February 25, 2008 Council meeting. <br />Please let me know if you have any questions or require additional information. <br />2 <br />