Laserfiche WebLink
Attachment D <br />1:=w <br />we "I, <br />Sent: Friday, March 11 a 2011 2:34 PM <br />To: *RVCounciI <br />Subject: Josephine Woods/Smith Development agreernent for project south of the Pulte Josephine <br />Woods Project <br />Dear City Council Members,: <br />As a developer in 1988 , 1 had an option to purchase the commercial site at the corner of <br />Lextin ton and Woodhill Dr. I believe that at the time I was told by the developer that the <br />project was contingent on the city agreeing to allow a cul-de-sac at the Western end of Cty. <br />Rd C-2 from Lexington and not allowing C-2 to be connected as was, Ramsey Counties, Plan. The <br />reason given to me was that in order to sell the homes, on that stretch of road, they needed <br />it in order to be able to sell the homes,. <br />I am a resident at 1,21,0 Josephine Rd., so this project is extremely important to me and <br />others, that will have traffic diverted to Fern wood and Josephine Rd. I tried to get an copy <br />of the Development Agreement for that project and was, told that I would have to wait for the <br />City Attorney to review the agreement. That in itself rais,es, red flags,! <br />I just wanted to find out what time period the city agreed upon and why they are not truthful <br />on this matter. If I am wrong, then show me the agreement or any side agreement with the <br />Developer or George Reiling and I will be s,atis,fied. <br />I have also asked for the traffic report and the methodology that was used to take the <br />traffic counts,.. It was, done in January, when it was, cold and snowy and not at the peak times, <br />in the summer when traffic doubles,. I would like to have the firm that did traffic studies, <br />for me to review this report and the methods, used to do the study to see if it was the <br />correct and best way to do the study and if it gave good res,ults,. So far no one on Josephine <br />Rd has received and copy that they asked for and neither have I. This makes, me very <br />s,us,picious,. In the Planning <br />Commission meeting some of the comments, from those who live on C-2 that opening, C-2 was, sure <br />to bring injury to children was a little bit of theater. Obviously the same is true for the <br />resident in the Fern wood and Josephine neighborhoods,. The answer is simple. Put a three way <br />stop at the top of the hill on C-2 with through traffic going west on C-2. <br />All of this may be mute if it can be proven that the City made an agreement for a period of <br />time not to open up C-2 as was, the intent when C-2 was, first constructed. <br />Another thing I will ask the council is how in the world did Josephine Rd be designated a <br />connector road. The City required that sidewalks, be put in on a narrow 2 lane road and now it <br />is smaller with little parking or ability to get to our mail boxes,. Traffic backs, up all the <br />way to Fern wood. Also because of the side walk that no one wanted there are many walkers, <br />that use year round. Also the neighborhoods, to the south of C-2 use Fern wood and other <br />streets, to walk to the Lake There are no side walks, on C-2 and it is much wider. This could <br />be because of an agreement that would not allow C-2 to be extened. I would like to have the <br />information that I requested before the next Council meeting on March 25th. <br />This proces,s, is moving to fast and I would ask for this to be taken off the March 25th agenda <br />and discussed at the April 11th agenda to give us, more time to collect and review the above <br />information. <br />Thank you for your time and consideration <br />Wendell R. Smith <br />1,21,0 Josephine Rd. <br />Page 2 3 of 25 <br />