My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0808_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0808_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:51 PM
Creation date
12/29/2011 12:02:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />Move this section of the code to 803.04. <br />2' J) ...................................................... 1111111111111"(7riteria addressed. The erosion and sediment control plan shall address the <br />. ................. <br />following criteria.- <br />a. Conform to the natural limitations presented by topography and soil so as to <br />create the least potential for soil erosion. <br />b. Stabilize all exposed soils and soil stockpiles <br />c. Establish permanent vegetation <br />d. Prevent sediment damage to adjacent properties and other designated areas <br />e. Schedule of erosion and sediment control practices <br />f. Use temporary sedimentation basins <br />g. Stabilization of steep slopes <br />h. Control the storm water leaving -a the site <br />i. Stabilize all waterways and outlets <br />j . Protect storm sewers from the entrance of sediment, debris and trash <br />k. Control waste,, such as discarded building materials, concrete truck washout, <br />chemicals,, litter and sanitary waste that may adversely impact water quality <br />1. When working in or crossing water be4iesresources,, take precautions to <br />contain sediment <br />m. Restabilize utility construction areas as soon as possible <br />n. Protect paved roads from sediment and mud brought in from access routes <br />o. Dispose of temporary erosion and sediment control measures <br />p. Maintain all temporary and permanent erosion and sediment control practices <br />q. Removal of sediment from streets at the end of each day <br />c,ontents of Plan. The erosion and sediment control plan shall include the following <br />..................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.