My WebLink
|
Help
|
About
|
Sign Out
Home
2011_0808_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2011
>
2011_0808_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:51 PM
Creation date
12/29/2011 12:02:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Move this section of the code to 803.04. <br />j . Storm water management.- how storm runoff will be managed, including <br />methods to be used if the development will result in increased peak rates or <br />volume of runoff <br />k. Maintenance.- schedule of regular inspections and repair of erosion and <br />sediment control structures <br />1. Calculations.- any that were made for the design of such items as sediment <br />basins,, diversions,, waterways, and other applicable practices <br />1018.05: PLAN REVIEW 4nom' -44=A-N: <br />1) General. The City appoints the City Engineer to review the erosion and sediment <br />control plan to ensure compliance with the City of Roseville Erosion and Sediment <br />Control Speei4eatie*s.�tztndards. <br />2) Permit required. If the City determines that the erosion and sediment control plan <br />meets the requirements of this article, the City shall issue a permit, valid for a <br />specified period of time that authorizes the land disturbance activity contingent on the <br />implementation and completion of the erosion and sediment control plan. <br />3) Denial. If the City determines that the erosion and sediment control plan does not <br />meet the requirements of this article, the City shall not issue a permit for the land <br />disturbance activity. The erosion and sediment control plan must be resubmitted for <br />approval before the land disturbance activity begins. No land use and building <br />permits may be issued until the Permittee has an approved erosion and sediment <br />control plan. <br />4) Permit suspension. If the City determines that the approved plan is not being <br />implemented according to the schedule or the control measures are not being properly <br />maintained,, all land use and building permits must be suspended and stop work order <br />issued until the Permittee has fully implemented and maintained the control measures <br />identified in the approved erosion and sediment control plan. <br />1018.06e. PLAN IMPLEMENTATION AND MAINTENANCE 4nom' -P4nkN: <br />All storm water pollution controls noted on the approved erosion and sediment control plan shall <br />be installed before commencing the land 4ist*Fbi*gdi sturbance activity, and shall not be removed <br />without City approval or issuance of qftppfe-v�a Certificate of Completion. <br />dr <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.