Laserfiche WebLink
Department Approval <br />WA <br />WPWA <br />Rls�kspvlffi� <br />REQUEST FOR COUNCIL ACTION <br />Date: 5119108 <br />Item No.: 12.c <br />City Manager Approval <br />Item description: Skating Center Arena Geothermal Project — Consideration of Contract <br />BACKGROUND <br />The official best -value process is complete through the pre -award phase for the geothermal project at the <br />Roseville Skating Center Arena and the team has identified the apparent best -value proposal as Harty <br />Mechanical, Austin Minnesota. In this case Harty Mechanical also had the low base price proposal. The <br />proposal, not including contingency is as follows: <br />Contractor Base Proposal Alternates Total Project <br />Hardy Mechanical $1,570,000 $047,400 $2,217,400 <br />To separate out some major components of the "full" geothermal system the request for proposals and <br />the value engineering process included a base proposal for the general installation of the geothermal <br />system plus 10 alternates, the alternates were as follows: <br />Alternate 1 <br />Concrete floor installation <br />Alternate 2 <br />Replace Arena Rooftop Units (RTUs) <br />Alternate 3 <br />Replace Meeting Room RTUs <br />Alternate 4 <br />Paving and Curbing of GHX Area (well field area) <br />Alternate 5 <br />Refrigeration Detector Systems <br />Alternate 6 <br />Deduct for Demolition of Dasher Boards <br />Alternate 7 <br />Controls for RTUs in Alternate 2 and 3 <br />Alternate 8 <br />Removal of Concrete Pier —unit price if needed <br />Alternate 9 <br />Add 6th refrigeration heat pump for redundancy <br />Alternate 10 <br />Add 12 wells to GHX for redundancy <br />A review and recommendation letter from Karges- Faulconbridge, Inc. (KFI) is included in your packet. <br />Representatives will be at the meeting to review the proposal and answer any questions. <br />The schedule is still very important if the project is going to be done this year. At this point the <br />schedule is on track, user groups have been rescheduled and the apparent best -value contractor has been <br />identified. <br />Page 1 of 3 <br />