Laserfiche WebLink
Applicant: Roseville Recommended. Funding Amount: $305,000 <br />Project Name-. Har liar Apartments O07- X 1 <br />Southwest corner of Snelling Avenue Forth and Highway 3 <br />Project Description: <br />Har Mar Apartments is an existing 120-unit apartment building complex built in 1965. Situated on a .4- <br />acre site, the development. contains five buildings of 21 to 26 one - bedroom- units per building, the <br />majority having a significant amount of deferred rna i ntenance and in need of major repair, Them is also <br />an approximate 25 percent vacancy rate- currently at the buildings due to unrentable units. Central <br />Community Housing Trust (CCHT),, with the support of the City of Roseville, proposes to rehabilitate the <br />existing property into 103 one and two bedroom, apartments. The rehabilitation plans will diversify the <br />unit type to provide increased housing choices for low and moderate - income workers, as well as some <br />market -rate apartments. Affordable rents will be targeted to residents at 30, 50 and 60 percent of area <br />median income. C HT will als -o male considerable improvements to the building exteriors, add <br />landscaping and recreation areas, including a tot lot for children. Stonnwater improvements proposed at <br />the property will help alleviate stormwater capacity issues that have been occurring in the area during <br />heavy rain events. The site improvements will help make passible a future phase to construct a new <br />building on the site that would include 50 two- and three - bedroom affordable apartments; in a location <br />that is currently surface parking. <br />Funding Requested /f=unding Recommended: <br />rri -2 r; A a mrr n r f%rh n rlr .-. 41-- 1 A - -1 . iP'77 ilk fk Jn A <br />MOU <br />Mon <br />- y.. <br />n <br />c viuiids <br />i7c d -tl <br />� �i�tiu�d: �I � -• <br />$127}000 $1272000 Removal of obsolete infrastructures — timber and brick <br />retaining walls, bituminous pavement, concrete curb and <br />pavement, wooden sheds, pool <br />1 $138,000 S tormwater management rain gardens, soil amendment, <br />storm sewer, inlet structures, native vegetation <br />$45,100 $45,100 Design and engineering for site demo, grading drainage, and <br />stonnwater management 2lan <br />$241.000 4500 o Site grading for directing water away from buildings <br />Previous L DA Grants Received For This or Related Project: None. <br />Development Timeline: <br />Removal of obsolete infrastructures timber and brick retaining .tune 2008 September <br />walls, b ituntinous pavement, concrete curb and pavement, wooden 2008 <br />sheds, pool <br />tormwater management — rain gardens, soil amendment, storm ,tune 2008 June 2009 <br />sewer, inlet structures, native vegetation <br />Design and engineering for site demo, grading drainage, and October 2007 May 2008 <br />storrnwater management plan <br />Site grading for directing water away from buildings June 2008 June 2009 <br />