Laserfiche WebLink
r:; <br />LZWIMM ;.; : ;.,` INC. <br />►�: MECHANICAL <br />CONTRACTING, <br />1600 1ST Avenue ICE <br />PO Box 277 <br />Austin., MN 55912 <br />www.hartymechanieal.com <br />Quality Control Plan <br />I Detailed Project Schedule is attached. <br />II Detailed. list of client action items* <br />Value Engineering items decided by owner. <br />Contract completion by ownex. <br />Detailed list of all client risks and concerns. <br />Shop drawing meeting. <br />Update plans with addendum s. <br />May 21 s'} 2008 <br />May 28 th� 2008 <br />May 30", 2008 <br />May 30", 2008 <br />June 6 1h 3 2008 <br />Owner/ Engineer shall bring plans to first construction meeting. <br />Weekly construction meetings, starting week of June 9th, 2008. <br />Phone (507) 437 -8201 <br />Fax (507) 437 -8378 <br />City of Roseville <br />City of Roseville <br />City of Roseville <br />City of Roseville <br />FI <br />Harty Mechanical <br />City of Roseville <br />City of Roseville <br />IMF l <br />City of Roseville <br />KF1 <br />Harty l ecb ani cal <br />Subcontractors <br />III Detailed list of all vendor risks, <br />Risk] Project base bid is over budget. <br />Plan to Minimize Harty l e6ani cal has offered value cngineeiin g items to owner. <br />Risk ##2 The schedule for this project is very aggressive to complete all specified tasks. <br />Plan to Minimize Provide an aggressive schedule with short term milestones. Attached i.s a preliminary <br />schedule, Harty Mechanical will update construction schedule once the City of Roseville <br />males the final decisions on vE items. Harty Mechanical will need these decisions <br />finalized by May 2 1" to stay on schedule for the project. <br />Risk #3 The glycol percent that is called out at 10% is too law of a concentration for good <br />inhibited protection. <br />Plan to Minimize Project specification section 15110 2.12 states: <br />A. Fluid (evaporator side): Shall be ethylene solution mixed 35% glycol. <br />