Laserfiche WebLink
.F' <br />AP <br />I <br />CONTRACTING <br />16001ST Avenue NE <br />Po Box 277 <br />Austin, MN 55972 <br />MECHANICAL <br />Phone (507) 437 -8201 <br />fax (507) 437 -$378 <br />ww.hart rnechanical.corn <br />B. Fluid (condenser side): Shall be propylene solution mixed 0% glycol. <br />Not a. valid risk to the City of Roseville. will not impact construction cost or <br />construction schedule. <br />Risk #4 Damage to any existing cl ectri cal conduit or wire due to removal of dasher boards <br />Plan. to Minimize Locate conduit and electrical wire with `gas built"', plans. If conduit is damaged during <br />construction and was not on the "as built" plans the following will take place: <br />1) Get a price from electrical contractor to repair the damage, <br />2) This cost will be the responsibility of the City of Roseville. <br />3) This will not affect the construction schedule. <br />If conduit is damaged during construction and it was located on "as built'" plans the <br />following will take place: <br />I Contractor that damaged conduit will be responsible for repair. <br />2) This will not affect construction schedule. <br />Risk 45 Limited breaker expansion space is available in the existing designated electrical. service <br />panels. <br />1 <br />Plan to Minimize IFI is verifying there is enough power to add the 40 ton R TU and add the additional <br />refrigeration heat pump in the future. There would not be any breaker space for future <br />expansion. 1 f I FI verifies that there is enough power for the equipment listed above. <br />1) This will not affect costs or construction schedule. <br />If KFI verifies that there is not enough power for the equipment listed above the <br />following will take place: <br />l Verif y how many amps need to be added. <br />2) Obtain quote from electrical contractor to add the service. <br />3) This cost will be the responsibility of the City of Roseville, <br />4) This will delay the construction schedule by four days. <br />Risk #6 During excavation for the installation of the new Geothermal loops the existing parking <br />lot lighting feeders may inadvertently be damaged. This may be changed to south <br />parking lot. <br />Plan to Minimize Locate all underground utilities before demolition of parking lot. If conduit is damaged <br />during construction and was not located the following will take place: <br />l Obtain quote from electrical contractor to repair the damage. <br />2) The change order would be the responsibility of the City of Roseville. <br />3 This will not impact the construction schedule. <br />If conduit is damaged during construction and it was located the following Sri l l take <br />place: <br />l ) Contractor that damaged conduit will be responsible for the repair. <br />