My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0609_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0609_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:53 PM
Creation date
12/29/2011 3:25:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:zsnac�:_] rrMmaCb"8 I <br />j a s- "je <br />P.O. BOX 277 <br />AUSTIN, MN 55972 <br />June 3, 2008 <br />City of Roseville <br />660 Civic Center Drive <br />Roseville, I I N 5511 <br />Attn: Mr. Jeff Evenson <br />Fie: Energy Guarantee <br />One year energy guarantee <br />MECHANICAL CONTRACTING <br />PHONE (507) 437 -8201 <br />FAX (547) 437 -8378 <br />www.harfymechanical.com <br />Price included in contract cost <br />Measurement and verification of Savings: The analysis of the reduction in facility BTU consumption <br />resulting from this upgrade will be based on the following: <br />Pre - construction measurements of the current system performance will be utilized to establish a base <br />lire for the current systems energy consumption. <br />0 Prior to removal from service selected equipment will be tested and monitored in an agreed upon <br />manner, system performance and test methods will be documented and reviewed by an <br />independent consulting engineer. <br />o After substantial completion of the work the new equipment will be retested under similar <br />operating conditions and test methods and the reduction in energy use will be documented and <br />reviewed by an independent consulting engineer. <br />Energy Deduction. Terms: At the end of the year HMI will review the energy records for the year and <br />provide a written report documenting actual energy savings based on the adjustments outlined in the <br />scope section of this document. <br />Guaranteed Energy reduction: The energy reduction guarantee is for the facility's total ETU <br />consumption only. Hlvll has no control of and cannot guarantee future utility rates and charges. <br />Guaranteed reduction Met or in Excess: If the actual energy savings as determined above- are at, or <br />in excess of the guaranteed energy savings H IVII's obligations under this agreement are met. If the <br />energy reduction is in excess of the guarantee HIVII and Customer will share the energy savings <br />excess. Customer will provide a lump sum payment of 0% of the excess guaranteed savings to <br />HIVII based on (1) year's annual operating cost. <br />Guaranteed Savings Shortfall -: If the actual energy savings are below the guaranteed energy <br />savings amount, HIVII will investigate to determine what caused the savings shortfall. HIVII will be <br />allowed to work to rectify the shortfall through improvement in operation and/or changes in systems <br />with prior written consent of the city of Roseville. However,. if the guaranteed level of enemy savings <br />is not achieved, the difference will be quantified and a payment will be provided to the Customer <br />based on ( 1) yea-r's annual operating cost. <br />Enemy Reduction Guarantee amount is 579,000 Wh /gear equivalent for the ice arena facility. This <br />amount is the Burn of both electrical and natural gas use reductions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.