My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0609_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0609_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:53 PM
Creation date
12/29/2011 3:25:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL <br />CONTRACTING <br />1600 1ST Avenge NE Phone ( o7) 437 +8201 <br />Po Box 277 Fax (507) 437 -8378 <br />Austin{ MN 55912 <br />www.hartymech,anl'cal.com <br />under construction. <br />Risk #6 Unforeseen conditions not listed above. <br />Plan to Minimize 1 On site personnel will review all problems and report to I F1 to discuss problems. This <br />will he followed by an RFL <br />2) All RFI's will he seat with solutions to the problems listed in the RFL If them is a cost <br />change, the cost shall be broken down to review. This will minimize the time that Harty <br />Mechanical, KF1 and the City of Roseville will need to male a decision. we have to <br />minimize any delays to ensure ice her the deadline. <br />Risk #7 City of Roseville is rcquesting a 30 day cure time for new concrete floor which is a <br />Problem with the aggressive construction schedule, <br />Plan to Minimize Harty Mechanical is currently gathering information from concrete experts to present to <br />the City of Roseville. Currently Harter Mechanical has included a 14 day cure time which <br />would. he a minimum. This does not impact the construction schedule or cost. <br />If the City of Roseville decides that a 30 cure time is a minimum. This will impact <br />construction casts and the construction schedule. The current schedule for modifying the <br />rink floor is approximately two months. A 30 day care time would change the schedule <br />to approximately a month to complete. The City of Roseville would have the following <br />lowing <br />options: <br />1 ) Start the construction schedule earlier to allow for the 30 day cure time. <br />2) Move the completion date hack to allow for the 30 day cure time. <br />3) Pay for increased overtime, which may he a significant dollar amount. <br />Risk #8 The City of Roseville is requesting an energy savings guarantee. <br />Plan to Minimize See attached energy guarantee. <br />V1 Quality Assurance Checklist <br />Harty Mechanical shall import Quality Control plan into a spreadsheet. This will be a <br />summarized QC plan that wilI be reviewed during the weekly construction meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.