My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0616_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0616_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2011 9:16:21 AM
Creation date
12/30/2011 9:04:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Thomas Faschke <br />City planner <br />Page <br />The arrival schedule is as follows: <br />Tuesday July 8th - The Advance Crew will arrive at the fairgrounds. Their function is to <br />mark out all of the parking areas that will acconunodate families, caravans (groups of <br />between 25 and 200 units that park together), handicapped coaches, volunteer family <br />coaches and demonstration coaches. The advance crew and Association officers consist <br />of approximatety 120 coaches. <br />Friday, July l l th The Holding Area will open to accommodate early arrivals, The <br />Holding Area is located at Highcrest Park, 2340 Hi.ghcrest load, Roseville, MN about 3 <br />miles from the Fairgrounds. There will be about 250 coaches in and out of the area over <br />the weekend of July 11t'. <br />Saturday, July ] 2th — The first day of family parking in assigned lots at the fairgrounds, <br />Many of the coaches arriving that day are the caravans. The other group will be the <br />handicapped coaches and they are also parked at the fairgrounds. <br />Sunday, July 13 h — A continuation of family coach arrivals. <br />Monday, July 14th — Third and final day of family coach parking. <br />The Convention will be open on Monday night for a preview. Tuesday morning is the <br />official opening. The close of the event is on Thursday night July 17'h at 5pm. <br />We would like to begin the installation of the temporary signs on Wednesday July 9th <br />with completion on Thursday July 1 okh if needed. Also, if required, all signs will have a <br />copy of the permits attached. <br />We would normally start the removal of the directional signs on Wednesday July 16'h and <br />finish on Thursday July 1 7th, All the signs will be removed. <br />Enclosed is the proposed sign list along with maps indicating the sign location and their <br />route, please let me know if you will need any more inforivation for us to obtain the <br />permits needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.