Laserfiche WebLink
Attachment C <br />BUELL CONS ULT TING, INC, <br />- � 2324 University Avenue West, Suite 200 Site Acquisition <br />_ Saint Paul, Minnesota 551 1 -1854 Permitting <br />(651) 225 -0792 Est. 991 <br />Fax 1 225 -0795 <br />April 10, 2009 <br />City of I Roseville <br />Planning Come -nissioll <br />o Community Development Department <br />2660 Civic Center Drive <br />Roseville, MN 5511-3 <br />E: PUD Amendment Application <br />EagleCrest <br />AT &T Telecommunications Facility <br />Dear Sir's and madam's: <br />On behalf of AT&T Mobility (AT&T), please accept this letter and the attached PUD <br />Amendment application to allow AT &T to utilize a portion of the rooftop at the EagleCrest senior <br />apartments facility for the purposes of installing panel antennas and associated equipment in <br />order to improve their wireless network in the surrounding area. <br />C UIPME 1T NEEDS ARID REQUIREMENTS <br />Deployment of the AT&T system is accomplished through the siting of "Cell Sites" at locations <br />that meet the Radio Frequency F engineering requirements determined by AT&T RF <br />Engineers. AT &T RF Engineers determine the location of these Cell Sites after careful analysis <br />of customer demand', site topography, signal propagation models and relationship to existing Cell <br />Sites. The EagleCrest building was identified by AT &T as an ideal location to meet the <br />increasing customer demands in the vicinity of Northwestern College, Snelling Avenue, and <br />surrounding neighborhoods. <br />A Cell Site needs to be located on an existing structure that will provide the necessary height for <br />adequate propagation of the signal to reach the targeted areas. The following equipment will <br />need to be placed on the rooftop at EagleCrest to meet the system requirements: <br />• Si panel antennas mounted nted in pairs in a three sector arrangement. As proposed, one <br />pair would be mounted out of sight in the rooftop penthouse window facing the front (east) <br />side of the building. One pair would be mounted on a frame on the north end of the building, <br />and the third pair would be mounted on the side of the equipment shelter on the back (west) <br />side of the building. <br />• Equipment necessary for the operation of the Site would be located inside a 10' x 1 <br />lightweight shelter located on the hack portion of the roof that would be located in <br />symmetrical fashion to the proposed T- Mobile equipment platform. The shelter would he <br />deslorn d and painted to match both the building and the proposed T- Mobile creenwa.lI. <br />