My WebLink
|
Help
|
About
|
Sign Out
Home
2009_0518_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2009
>
2009_0518_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 2:47:18 PM
Creation date
1/6/2012 2:54:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed design of this installation would appear to have no effects on the existing P D or <br />operation of the Eagl Cre t facility. The use requires no unusual poorer or telco facilities and <br />would have no impact on any City facilities, Futilities or services. <br />OPEN HOUSENEIGHBORHOOD MEETING <br />As required, AT &T has scheduled an Open Hue at the site on April 16 from 6-7:00 PM. <br />Detailed construction plans and photo simulations will be made available. AT &T provided notice <br />of the meeting to residents, City Staff and elected officials based on a list generated by the <br />Community Development Department. A total of 76 notices were sent out. A written summary <br />of the open house will be provided to the City no later than April 20. <br />If you have any questions or need additional information please don't hesitate to contact me. <br />Sincerely, <br />'7 <br />Mark Hemstreet <br />Buell Consulting, Inc. <br />Authorized Representative of AT &T" <br />651-283-5975 <br />
The URL can be used to link to this page
Your browser does not support the video tag.