My WebLink
|
Help
|
About
|
Sign Out
Home
res_9402
Roseville
>
City Council
>
City Council Resolutions
>
09xxx
>
9400
>
res_9402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:38:13 AM
Creation date
12/2/2004 9:19:18 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
9402
Resolution Title
Approving a Conditional Use Permit to allow construction of one cellular telephone tower by APT, consisting of a 150 foot lattice work steel, self-supporting telephone tower and equipment cabinets on the western edge of the property commonly known a
Resolution Date Passed
4/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "A" <br />04/14/97 <br />PF2882 <br /> <br />Conditions to be attached to Conditional Use Permit Resolution <br /> <br />This conditional use permit (CUP) shall be for one communications tower consisting of a <br />150 foot steel, self supporting telephone tower and equipment cabinets on the <br />southwestern corner of property commonly known as the St. Paul Water Authority <br />Reservoir site with conditions as follows: <br /> <br />1. The maximum height above grade at the tower base shall be 150 feet. Up to12 <br />radio/antenna at a size specified in the application, may be installed on the tower. <br /> <br />2. The applicant shall apply for and receive a license/tower permit from the City of <br />Roseville prior to applying for a building permit. <br /> <br />3. All CUP application materials shall be considered part of the permit. The applicant <br />shall apply for and receive a building permit prior to commencing construction. Supporting <br />documents for the building permit shall include a Minnesota registered engineers <br />calculations and certification of structural strength and stability. <br /> <br />4. Approvals in writing from the Water Authority for access over, under, or on the <br />surface of Water Authority property by machinery technicians, and underground wires shall <br />be included in the building permit application. <br /> <br />5. The base of the tower shall be located in an area at least 150 feet from any <br />occupiable structure. <br /> <br />6. All utility wires or lines leading to the equipment panel site shall be buried. <br /> <br />7. The applicant shall adhere to provisions of City Code Section 1012.10, subp. 5 <br />through 7 and 9 through 12, except that paved driveways and parking spaces shall be at <br />the discretion of the City. <br /> <br />8. The proposed steel tower shall be self supporting - no wires or guys are necessary <br />to anchor it. The cellular phone antennas on the tower (up to twelve - 4 companies/ 3 <br />antennas each) shall be a maximum size of 6.6 feet long, 6 inches wide, and 1.5 feet thick. <br />These antennas will operate in the 1.9 Ghz to 2.2 Ghz radio frequency range, transmitting <br />and receiving a low power wireless radio signal to a service cell primarily in eastern and <br />central Roseville. No sewer or water service shall be installed. <br /> <br />9. A prefabricated set of equipment panels may be installed near the base of the <br />tower. They will be connected to the tower by one cable to each antenna. <br /> <br />10. A 30 foot by 40 foot equipment panel area with security fencing (up to 8 feet high <br />
The URL can be used to link to this page
Your browser does not support the video tag.