My WebLink
|
Help
|
About
|
Sign Out
Home
res_9402
Roseville
>
City Council
>
City Council Resolutions
>
09xxx
>
9400
>
res_9402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 8:38:13 AM
Creation date
12/2/2004 9:19:18 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Resolutions
Resolution #
9402
Resolution Title
Approving a Conditional Use Permit to allow construction of one cellular telephone tower by APT, consisting of a 150 foot lattice work steel, self-supporting telephone tower and equipment cabinets on the western edge of the property commonly known a
Resolution Date Passed
4/14/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and topped with barbed wire) shall be located adjacent to the site and approved by the <br />Community Development Director. The equipment area shall be screened by landscape <br />plantings to reduce at-grade visibility of the equipment. The Community Development <br />Director shall review and approve the landscape screening and fencing plan and location. <br /> <br />11. The tower shall not be lighted. Electric and phone wires serving the equipment and <br />tower shall be buried. Security lighting on the site shall be downcast on the equipment <br />areas only. <br /> <br />12. The City may place additional emergency services whip antenna for fire, police, and <br />public works on the same tower. The City may own the tower. <br /> <br />13. The 150 foot tower and supporting equipment shall be completely removed from the <br />site by the applicant after operations cease, equipment is damaged or unsafe as <br />determined by the City Building Official, or the CUP elapses, or the CUP is violated. The <br />City may require posting of a bond to assure removal of the tower and or equipment by the <br />applicant in a timely manner. <br /> <br />14. After approval by the City Council, one temporary tower may be installed on the site <br />for up to 120 days with a possible extension of up to an additional 120 day by the City <br />Council. The tower and supporting equipment shall be completely removed from the site <br />by the applicant after operations cease, equipment is damaged or unsafe as determined <br />by the City Building Official, or the temporary permit elapses. The City may require posting <br />of a bond to assure removal of the tower and or equipment by the applicant in a timely <br />manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.