My WebLink
|
Help
|
About
|
Sign Out
Home
1982_0308_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1982
>
1982_0308_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2012 2:15:39 PM
Creation date
1/27/2012 2:12:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />m �r <br />3 February 198 <br />dr . <br />9: <br />I <br />b v <br />PLANNING REPORT <br />CASE NUMBER: <br />APPLICANT: <br />LOCATION -z <br />1358 -5 <br />William Steinworth <br />East of Hamline Avenue, North of <br />Larpenteur Avenue <br />ACTION REQTJEST ED : Approval of Special Use Permit for <br />Planned Unit Development (PUD ) <br />Vacation of Right -of -Way <br />Approval of Preliminary Plat <br />PLANNING CONSIDERATIONS: <br />I + The property in question was replatted by the applicant in 1973 into two <br />lots, one of which was north of the cul -de -sac (lone Street, easterly <br />from Hamline), and one of which was south of the cul-de-sac. The land <br />to the north was zoned R-4 (f cur units per structure) and the land to the <br />south was zoned R -6 (a townhouse district) . <br />The plat approved at that time included. A cul-de-sac at the end of lone <br />Street which was originally platted with the single family homes fronting <br />on Hamline Avenue. The city Engineering Department at that time, <br />conducted a feasibility study for the construction of Ione Street <br />including the cul -de -sac on the property in questlon; Due to poor soil <br />conditions, it was determined that the construction of the cul -de -sac <br />and its utilities were economically unfeasible. Thus, the lard was not <br />developed under that plat as proposed in 1973. <br />2. A few months ago the applicant hired Pape Associates, architects to prepare <br />a revised development plan. The current plan proposes two single family <br />homes on the northerly portion zoned R -4 and a 12 unit structure on the <br />southerly portion zoned R -6, The applicant has submitted a request for a <br />Special Use Permit for a Planned Unit Development ( PUD) which would allow <br />for the spreading of the density, changing the plan from the original <br />18 units to be constructed on the site to a total of 14. Access is proposed <br />to the site by the extension of a cul,de -sac off Dellwood Avenue retaining <br />the existing right -of -way and adding a 120 foot diameter cul -de -sac for <br />the turn - around! The lots are platted so that each lot has frontage on <br />this proposed public street. <br />3. You will note from examining the attached reduced copies of the plat, <br />development plan, and the elevations of the structures, that the two single <br />family lots would have frontage on the westerly side of the cul -de -sac, <br />with lot areas exceeding the minimum 15,000 square feet required in the <br />R -4 District. The remaining parcel which exceeds 75,000 square feet in <br />
The URL can be used to link to this page
Your browser does not support the video tag.