Laserfiche WebLink
5911 <br />natural terrain, plus things like dra,inage areas that are still <br />uncompleted and internal access in the sub-area. <br />That logically connected P'lot streets be included with frontage street <br />?I <br />when considering a normal r�eet reconstruction improvement, <br />That the City be segment( nto logical sub-areas and a procedurg <br />developed for potential iping of streets for reconstruction tit <br />minimize disruption and )%ts' <br />Resolutions which reflect the ve approaches for dealing with the situation <br />w Ill be prepared for Council i ew on July 28, 19800 <br />I <br />Kim <br />