Laserfiche WebLink
Q) In addition to the above f ees (unless included in the <br />maximum fee filed by the initial installer) remote control, signal <br />circuits and circuits of less than 50 volts shall be computed at $3,011 <br />per each 10 openings or devices of each system plus $1.00 for each <br />additional 10 or f raction thereof . <br />This section is also applicable to inspection of empty conduits <br />and such other jobs as determined by the city. <br />(n) For inspection of transient projects including but not <br />limited to Carnivals and Circuses and the inspection fees shall bi. <br />computed as f oil ows: <br />Power supply units according to item W of Fee SchedLfle. A <br />like fee will be required on power supply units at each engagement <br />during the season, except that a fee of $14.00 per hour will 512- <br />charged for additional time spent by the inspector, if the power <br />N. <br />supply is not ready for inspection at the time and date specified on <br />the request for inspection as required by law. <br />INUO <br />Section 32.110 of the City Code of the City of Roseville is hereby amendeii <br />$T=- <br />" <br />0-o r. <br />32el.1 Plumbin.1 <br />(1) Plumbing Fixtures, Devices and ConnectionsL. <br />For the installation of plumbing work the permit fee charge <br />shall be made at the rate of $10.00 for each permit, is $2,50 for <br />each plumbing fixture, device or connection to the sewer or plumbing <br />system, <br />