Laserfiche WebLink
M-0 - <br />` rtant that this process rave alone rapidly because of the desire <br />It is � . <br />�t of nc� <br />constructed this years -it is expected that the puab lic + Meetings will <br />�ett�. <br />be held <br />a. each primer # rderir in the work, a Joint Viers Agreement <br />c==ities needs to be de lOP and. signed f the plans and. spec "ta�.- <br />bet�.�n <br />cations need to be prepared by sER r penTIts reed tO be obtained frOm Ramey CQUntYO' <br />m and possibly the Corps of n1cJineersir and advertismmt sent out for the xece'pt <br />of bids, At this POint POsevil-le is await.'ng a response frarn Shoreview as to the <br />next step in the process, n" have indicated that a response will. be given <br />to us Mmday <br />W-Feas Iity Study <br />