My WebLink
|
Help
|
About
|
Sign Out
Home
1978_1010_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_1010_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2012 2:41:42 PM
Creation date
2/13/2012 2:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />October 4, 1978 <br />Page 3 <br />CONTIGUOUS TO GRASS LAKE <br />ne propose to make an investigation and study of outlet conditions through Lak <br />Owasso and Lake Owasso to Grass Lake in Shoreview, such that the impact of <br />facilities proposed within Phase I of this proposal may be evaluated in respeclq <br />to all drainage requiring an outlet through the various systems to Grass Lake <br />with ultimate eventual-potential discharge to West Vadnais Lake, I <br />Such work will include both office and field investigation and study including <br />hydrologic analyses therefor, Results will be presented in bound report form <br />consi.sting of comparable'data and detail provided in aforedescribed Phase I <br />except that potential alternative solutions are unknown at this time. However, <br />if such prove available or wDuld warrant consideration, thes'e will be presentedO <br />11"JUMMM <br />The compensation for services under Phase I and Phase II shall be on the basis <br />as set forth under SIECTION Il of our proposal to you for continui I ng engi * neerin <br />services dated January 16 and accepted by City Council action on January 23, <br />1978. This provides for compensation at 2,25 times payroll cost, mileage and <br />out of pocket expenses (copy is attached), <br />We estimate the cost on the foregoing basis for services under Phase I of this <br />proposal to be $8,000-.00, which.will include services of hydrologist, <br />Go M. Sunde at cost, <br />It los to be understood that if the work to be performed under Phase I is not <br />complete upon reaching the cost estimated above, we will advise you as to the <br />cost to complete that-phase of the work. <br />. F <br />x,oth Roseville and Shoreview agree to make available to us and furnish us with- <br />ill the exi'sting and'pertinent information in the way of maps, records, plans,- <br />contours, profile studies, etc. which are available in respect to all phases of <br />the work to be undertaken, <br />
The URL can be used to link to this page
Your browser does not support the video tag.