My WebLink
|
Help
|
About
|
Sign Out
Home
1978_1010_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_1010_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2012 2:41:42 PM
Creation date
2/13/2012 2:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Rosevillff.. <br />October 4, 1978 <br />Page 4 <br />During the course of this study we are to attend any and all conferences deemed <br />desi"'rable and proper regarding this matter with officials of both cities and <br />with state, metropolitan and Rice Creek Watershed officials when authorized.. <br />It is to be specifically understood that the engineering services provided in <br />this proposal do not include the cost of laboratory analysis, the cost of <br />boundary surveys or underground exploration of sub-surface conditions. These <br />items will be furnished on request and at our actual cost therefor. <br />It is to be understood that in signing this proposal , we are authorized to <br />proceed only with the work outlined in Phase I hereof. No work in connection <br />with Phase Il would be undertaken until further authorization. <br />it is our intention to employ the services of Mr Gerald M. Sunde, ground water <br />hydrologist, in connection with this work. We have contacted Mr. Sunde and he <br />I* <br />is agreeable to provide his professional services in connection with this work. <br />KI) a 14, 1 all <br />It is to be specifically understood that if we'are authorized to make this study <br />Rnd report, consisting initially of Phase I only, that the work shall be com- <br />pleted within 60 days of notification to proceed with the work, unless the scope <br />of the work is enlarged and another completion date is mutually agreed upon. <br />In summary, we shall consider this proposal an agreement between us upon itm <br />zcceptance by you and your notification in writing to proceed therewith. <br />�i <br />Accepted this - , day of 9 1978, <br />BY <br />Mayor <br />By <br />Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.