Laserfiche WebLink
Project SS-111-P-78-12 includes a chance frorpi, a 16 x 6" cut in connelction. to a <br />pressure tap al. FaIrview Avenue and Centennial Drive and a quantity. of <br />materials change due to the relocation of the storm sewer layout-, The net <br />decrease is $1,,885,06. <br />ProJect SS-14-P-78-7 includes a change from a 16 x 61 cut in connection to <br />a pressure tap at V!estern Avenue. and Sandhurst Circle, The net decrease i * S <br />$46, 40 M <br />Projett SS-W-P-77-3A include the deletion of th-e proposed sanitary sevier <br />a a -ne Road. The net decrease is 6 80, Th * <br />dacent to Josephi $92649 ts deletion <br />was reauested by the affected owner. <br />,Recommendations: <br />App.roval­ of Change Order No. I in Pro*ect 78-12 from cut in con- <br />h,ection to pressure tap at Fairview and Centennial Drive and the <br />relocation -of the storm sewer at a �ecrease 01�1 :885,06W <br />11 <br />2. Approval-'of. Change Order- No. 2 "n Project 78-7 from a'.cut in <br />connection to a pressure tao at 1-lestern Avenue and Sandhurst <br />Circle at a decrease iot46.4'06 <br />3. -Approval of. Change Order' No, -.3 of the sanitary sewer line <br />al ona Josephine Road as proposed in Project 77-3A - at' a- decrease of <br />$9,649,180.6 <br />R- 4 <br />Ktwu"b I th*Uil LoVU0J_U1L Ak� I 1UN <br />AGENOA SECTION'. <br />ORIGINATING DEPT./DIV.'.,, <br />DEPT. HEAD APPRUVAL. <br />Reoorts and <br />Recommendations Pub I i c 1-1orks- <br />ITF-,,-vl NO. iTEM <br />DETSCRIPTIOV <br />A 1P M . ......... . . . ........ ............ ... . .... <br />CKC"M E ORDERS 12 2 & 3 on CONT RACAT F <br />MGR. REVIEWED/ RECOMMExl)S_ <br />19,78 Improvemients 78-12, 78-7, 77-3A <br />The <br />consulting <br />firm, of Short, Ellloott,, Hendrickson, Inc., <br />have recomm nded <br />chanoes <br />%1. �o the <br />oriagional contract which produce quantity of <br />0 <br />materials changes. <br />and <br />total cost <br />changesT <br />Project SS-111-P-78-12 includes a chance frorpi, a 16 x 6" cut in connelction. to a <br />pressure tap al. FaIrview Avenue and Centennial Drive and a quantity. of <br />materials change due to the relocation of the storm sewer layout-, The net <br />decrease is $1,,885,06. <br />ProJect SS-14-P-78-7 includes a change from a 16 x 61 cut in connection to <br />a pressure tap at V!estern Avenue. and Sandhurst Circle, The net decrease i * S <br />$46, 40 M <br />Projett SS-W-P-77-3A include the deletion of th-e proposed sanitary sevier <br />a a -ne Road. The net decrease is 6 80, Th * <br />dacent to Josephi $92649 ts deletion <br />was reauested by the affected owner. <br />,Recommendations: <br />App.roval­ of Change Order No. I in Pro*ect 78-12 from cut in con- <br />h,ection to pressure tap at Fairview and Centennial Drive and the <br />relocation -of the storm sewer at a �ecrease 01�1 :885,06W <br />11 <br />2. Approval-'of. Change Order- No. 2 "n Project 78-7 from a'.cut in <br />connection to a pressure tao at 1-lestern Avenue and Sandhurst <br />Circle at a decrease iot46.4'06 <br />3. -Approval of. Change Order' No, -.3 of the sanitary sewer line <br />al ona Josephine Road as proposed in Project 77-3A - at' a- decrease of <br />$9,649,180.6 <br />