Laserfiche WebLink
AGENDA SEc-riON' <br />11111111 0 NEC���� �M <br />. . 1 1111. 9111� I �pIIIIIIII1111��Jiiq� <br />M AT'I <br />. r <br />MEETING <br />11/13/78 <br />DEPT. HE-AD APPR VAL. <br />r MGR. REVIEWED/ RECOMMENDS <br />CHANGE ORDER PIROJECT <br />1,1114t,IESOTA REALTY -COMPANYS OWASSO Plat <br />In order '-to establish the necessary paper work to comPl.ete this, a chance' order 1*5 <br />required- and contains the follow-Ing- <br />(2) The -wet -subbase and the heavy, rains 'in Ju-1 <br />y caused portions of <br />the base material tO Ultimately have to be removed b' 0 <br />0 ecause In complet ng the <br />e e work <br />it taas necessary to drive the quipmnt ' I I <br />on the roadway which was not yet strong <br />enough to carry the load, It was agreed that e I <br />th c*ty viould fund only $2,019.60 of <br />this remval cost with the contractor absorb*n <br />g t.he remainder, <br />(3) Right-of-way negot-at' <br />I ions were n t culmlnatedat the time the <br />earth mov'inq began on the job. The ultimate resol Of <br />required additional seeding or sodding to fit son Of the easement agreements <br />that in the,'Or'g*nal contract. Th I s' re- <br />quired the contractor to come back an additional tinie to Place bla'ck dirt. Aga* <br />thi's became a shared cost with -the cm i n <br />Ity portion be"ng $],-584.0014 <br />I <br />oil <br />It should be noted that parts of these expenses V111 be offset by the federal flood- <br />9 <br />re I I ef f und wh is ch the cis ty has a I ready 'acqu 1 red. and %-ftiere deslgnated.to cover these <br />problems. <br />