Laserfiche WebLink
<br />City of Roseville <br /> <br />Schedule of Fees and Charges for Service <br />Effective January 1, 2005 <br /> <br />(minimum charge one-halfhour) <br />Additional plan review required by changes, additions <br />or revisions to plans. . . . . . ... . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . .. . . . . . . .. . . . .. .$48.41 per hour <br />(minimum charge - one-half hour) <br />For use of outside consultants for plan checking, inspections <br /> <br />and similar costs........................................................................................... .Actual costsl <br /> <br />1 Actual costs include administrative and overhead costs. <br /> <br />Demolition Pel111it Fee: <br />Tenant improvement/remodeling prior to building permit <br />Stmctures not connected to utilities <br />Stmctures cOlmected to city utilities <br /> <br />$51.50 <br />$51.50 <br />$103.00 <br /> <br />Electrical Permit Fee: <br />Set through yearly contract with Contract Electlical Inspector <br /> <br />Fire Safety Inspection Fee: <br />An amount equal to eight percent (8%) of the amount detel111ined by the Building Pel111it Fee <br />(except for single-family dwellings) to be charged and used to defray the cost of fire safety <br />inspections (Ord. 1237,3-13-2000, eff. 5-1-2000) <br /> <br />Grading/Excavation Pel111it Fee: <br /> <br />Grading Plan Review Fee <br /> <br />50 cubic yards or less. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..N 0 fee <br />51 to 100 cubic yards or less............................................................... ...$24.20 <br />101 to 1,000 cubic yards.................................................................... ..$38.11 <br />1,001 to 10,000 cubic yards. .. . .. .. .. .. . .. .. .. .. . .. .. :. .. .. .. .. . .. .. .. .. .. . .. .. .. .. .. .. .. .... .$50.72 <br />10,001 to 100,000 cubic yards - $50.72 for the first 10,000 cubic yards, plus $25.24 for <br />each additional 1 0,000 yards or fraction thereof. <br />100,001 to 200,000 cubic yards - $277.84 for the first 100,000 cubic plus $13.65 for each <br />additional 1 0,000 cubic yards or fraction thereof. <br />200,001 cubic yards or more - $414.32 for the first 200,000 cubic yards, plus $7.47 for <br />each additional 1 0,000 cubic yards or fraction thereof. <br />Other Fees: <br />Additional plan review required by changes, additions or revisions to approved plans <br />(minimum charge - one-half hour). ................................... ...............$52.00 per hour <br /> <br />5 <br />