Laserfiche WebLink
<br />City of Roseville <br /> <br />Schedule of Fees and Charges for Service <br />Effective January 1,2005 <br /> <br />Grading Permit Fee <br /> <br />50 cubic yards or less........................................................................ ..$24.20 <br />51 to 100 cubic yards........................................................................ ..$38.11 <br />101 to 1,000 cubic yards - $38.11 for the first 100 cubic yards, plus $18.02 for each <br />additional 1 00 cubic yards or fraction thereof. <br />1,001 to 10,000 cubic yards - $200.33 for the first 1,000 cubic yards, plus $14.94 for <br />each additional 1 ,000 cubic yards or fi-action thereof. <br />10,001 to 100,000 cubic yards - $334.75 for the first 10,000 cubic yards, plus $67.98 for <br />each additional 10,000 cubic yards or fraction thereof. <br />100,001 cubic yards or more - $946.57 for the first 100,000 cubic yards, plus $37.60 for <br />each additiona110,000 cubic yards or fraction thereof. <br /> Other Inspections and Fees <br />1. Inspections outside of normal business hours............................. .$52.00 per hour <br /> (minimum charge - one-half hour) <br />2. Reinspection fees.............................................................. .$52.00 per hour <br />3. Inspections for which no fee is specifically indicated.................... .$52.00 per hour <br /> (minimum charge one-half hour) <br /> <br />Investigation Fee: Work without a Pennit <br />Whenever any work for which a pemlit is required from the city has been commenced without <br />first obtaining said pennit, a special investigation shall be made before a pennit may be issued <br />for such work. An investigation fee, in addition to the pennit fee, shall be collected whether or <br />not a pennit is then or subsequently issued. The investigation fee shall be equal to the amount of <br />the permit fee required by this code. The payment of such investigation fee shall not exempt any <br />person from compliance with all other provisions ofthis code nor from any penalty prescribed by <br />law. <br /> <br />Manufactured Home Permit Fee: <br />New installation <br /> <br />$154.50 <br /> <br />Mechanical Pennit Fee: <br />Residential <br />Air conditioning - new <br />Air conditioning - replacement <br />Warm air fumace - new <br />Warm air furnace - replacement <br />Hot water boilers - new <br />Hot water boilers - replacement <br />Unit heaters <br />SWilllilling pool heaters <br />Miscellaneous work & gas piping <br /> <br />$36.00 <br />$36.00 <br />$77.25 <br />$41.20 <br />$77.25 <br />$41.20 <br />$41.20 <br />$41.20 <br />1.25 % of estimated job cost <br /> <br />6 <br />