My WebLink
|
Help
|
About
|
Sign Out
Home
1978_0410_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1978
>
1978_0410_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 2:35:19 PM
Creation date
2/17/2012 1:42:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville <br />April 4, 1978 <br />Page 2 <br />as set for�h �nder SFCTIO� II of our proposal to you dated <br />January 16 and accepted by your City Councii on January 23, <br />1978. <br />We est�mate the cost for such eng�neering services to be $1,500, <br />�� being understood that if this phase af the work is not then <br />complete upon reaching said cost, we wil� advise you as to the <br />cost to complete this phase of the work, in addition to the <br />estima�ed cost of $1,5Q0. <br />2. D�TAILED PLANS AND SPECIFICATIONS <br />Upon your authorization we sfiall prepare de�aiied warking plans <br />and spec3fzcations for the proposed improve�ents. In preparing <br />these p1ans and specifications we w�11 confer with your Director <br />af Public Works and your Planager, and such others as representa- <br />tives of the Minnesota Highway Department and Ramsey County <br />Eng3neer's Office, as appropriaie. <br />We will also aid you in the advertisement of bzds, assist you in <br />receiving bids and making recommendatians for the award of the <br />construction contrac�, as well as prepari�g con�ract docume�ts <br />for construction. <br />For this work we are to be paid 60 percent of the basic fee, w�ich <br />shall be payable upan the approval of the p�ans and specifications <br />by the City, the basic fee being as described in subsequent <br />5ection 5 hereof. <br />3. GENERAL 4BS�RUATION OF CONSTRUCTION <br />We will, upon your authorization, provide general observation of <br />construction during the cours-e af ca�struction which wi1Z eonsist <br />of periodic visits to the project site as frequent as is eonsis�ent <br />with the progress of the work. We shall further review con�rac�or's <br />certified monthyy estimates for payment, f�nal contractor's <br />
The URL can be used to link to this page
Your browser does not support the video tag.