Laserfiche WebLink
City of Roseville <br />April 4, 1978 <br />Page 3 <br />es�imate �or payment, and recommendations concerning final <br />accep�ance of the work by the City. This work will not incluae <br />fu�l-time resident inspection nar does it inc�ude stakin� out <br />the work, which is ou�lined in Section 4 below. �Qr this work <br />we are to be pa�d 2� ercen� of the basic fee. <br />4. �xT�R S�RVICES <br />�!� wi1Z, �pon your authorizat�on, accampl�sh the actual staking out <br />of �he constructian at the rate of salary cast times a mul�iplier o� <br />2.10. Shou7d the City Counc�l desire, we sha�l also be pleased to <br />furn�sh ihe services of a fuil-time r�sident inspector w�ich is a�so <br />to be paid for a� the rate of salary cost times a multiplier of 2.1Q. <br />Mileage for staking crews and inspectors will be charg�d for when <br />actuaZly engaged in t�e project and at the rate we pay to our employee. <br />5. BASiC SERVICE5 AND FEE THEREFOR <br />The basic percentage fee which appl�es for engineering work i� <br />connection with the foregaing, w�ll be that basic fee within the. <br />range indicat�d on the compensation char� (a copy of wh�ch is a�tached <br />hereto) which is a part of "R G�IDE FOR ENGAGEMENT FOR ENGINE�RING <br />SERVICES (1972)", Plinnesata Society of Profess�onal Engineers and <br />Cansulting Engineers Cou�cil of M�nnesota. SUbject basic fee should <br />be computed as a percentage of the cons�ruction cvs� excIusive of <br />land, engineering, legal, financing and owner administration costs, <br />but including all materials and constructian, labor and aquipment. <br />The serviceswe propase to provide are enumerated in foregoing seciions <br />2, 3 and 4. It i� ta be understoad that �n signing this proposal, the <br />City is authorizing anly the work out�ined in Seciion 1 hereof. <br />it is st�pulated and agreed that all fees far Section 2 and 3 are <br />to be based on a percent of the construction cost as previously defined <br />except that if work does not proceed beyond the preparatinn of plans <br />and specifica�ions �under SeCtion 2), paymeni for prepara�ion af <br />