Laserfiche WebLink
1 (c) All side lot and double frontage parcels shall be determined to have 25 assessable <br />2 feet for the first 200 feet of said side or second frontage of the parcel and shall <br />3 conform to Paragraphs a. and b., above. <br />4 (d) Water services shall be assessed on a per service basis at 100% of the city's <br />5 expense for such services. <br />6 (e) All odd and irregularly- shaped lots of four sides or less, which have rear widths <br />7 that vary by more than 25% in comparison with the front width, the lot will be <br />8 assumed to have a depth equal to one -half the sum of the two sides and said depth <br />9 will be divided into the area of the lot to determine the assessable frontage. All <br />10 lots of more than four sides will be geometrically converted to a four -sided lot of <br />11 equal area, then the odd -lot formula as stated above, will be used to determine the <br />12 assessable frontage. Where this is not practical, the assessable frontage will be <br />13 determined by assuming the lot to have an assessable frontage equal to those of <br />14 the typical rectangular lots near it which are comparable in overall area and <br />15 nature. <br />16 <br />17 8. There shall be no assessments for pathway improvements. <br />18 <br />19 9. Streetlights shall be assessed on a front footage basis as described in the City street light <br />20 assessment policy and as follows: <br />21 (a) All properties within 150 feet (street frontage) of each light shall be considered <br />22 for assessment. <br />23 (b) City staff shall determine the number and locations of lights that could have been <br />24 installed under the "standard street light" section of the City's Street light policy. <br />25 The maintenance cost for these lights will be deducted from the overall project <br />26 cost. <br />27 (c) 100% of the additional costs for an "enhanced street light" project shall be <br />28 specially assessed. The additional costs for an "enhanced street light" project <br />29 shall include; Cost of installation of enhanced streetlights, cost of operation & <br />30 maintenance (pro -rated for 25 years), Administrative costs, minus "standard street <br />31 light" maintenance cost (if applicable) <br />32 (d) At the end of 25 years, the City will evaluate the maintenance needs for the <br />33 "enhanced street light" areas. A reconstruction project will be considered where <br />34 the new operation and maintenance costs for the next 25 years will be proposed to <br />35 be assessed to the benefiting properties. <br />36 (e) In new development and redevelopments, the operation and maintenance costs for <br />37 an "enhanced street light" installation shall be paid for by the property owners in <br />38 the new development in perpetuity. These costs shall either be paid for up front <br />39 by the developer or assessed to the property owners. The total cost shall be the <br />40 "enhanced street light" operation and maintenance cost minus the City's "standard <br />41 street light" contribution. The City's basic contribution shall be determined based <br />42 on the procedure outlined in section IV. B. of the City Street Light policy. <br />43 <br />Assessment Policy Summary Page 3 of 3 <br />12/24/03 <br />