Laserfiche WebLink
MEEFING <br />i�6����a� 1 ��� ��'�.3�°�...9� ��.+���J'� DATE: -��Z%%%6 . <br />AGENOLI SECTION : O�tIGINATING DEPT. /DIV_ : <br />R�:PJP.TS A,lD R�C�Ji�1r4E��i�,�TI01is PUf��IG :l��P,I:S <br />� <br />11 �.�, NO_ : lTEi� D�SCRIP7lON' <br />` CfiAf�GE ORDER N0. 3 for Project Ul-75-4, Qoast�r Station <br />�- _ � � <br />� <br />0 <br />Y <br />�EPl". HEAb 1}PPROVAL. <br />�ff <br />11AGR. REVIEWED/RECOMtu4ENDS: <br />As the plans were being develo�ed for the expansion of the water booster staiion, <br />it was nat�d that it tivould be desirable to have an overhead crane system for <br />1-ifting the large motors and pumps into position. Time dzd not permit �}�e inclu- <br />sion af this into the contract and, �herefore, bids w�re not obtained for t#�is <br />pzece o-F vrork. <br />The lotiv bidder has been can�acied on the ne�d of such an inciusion, haw�ver, an� <br />a change order has been prepar�d ti�rhich would p•ravidQ far the construction of an <br />ov�rhead beam and th� necessary hanger eq�aipment �a allow the very heavy materials <br />�o be moved mechanical�y into positian in the ev�nt that this is needed for main- <br />tenance. acti vi'i� es . The pri c� o-F �723. 00 has been estabii shed and thi s has b�er� <br />reviewed.by both ti�e consultani �ngineer5 and city staff and been found to be <br />appropriate. <br />REGOMME�JRED ACTIO�a: <br />C <br />Appr-oval of Change Order �Jo. 3 for the water booster�s�atifln <br />expansion ident�fied as Pro�ect W-76--4 �n tf�e amount o� <br />$723.0�. <br />n <br />