Laserfiche WebLink
AGF'°�A SEC710N: <br />�:t�E „�tTS A:la P.EL'O��lilE�JD;�7I0:lS <br />�n��ri�c 1�26/7b <br />� 3.�`..�L� � �� �`�,.�' � �.r�,i � i'f 1,.s � � ���i �l �� OAF�: <br />QRtG{NATING DEPi./DIV.: <br />PU�I.IC :1�Pi:S <br />irEti� �o.: a�rEnn fl�scR��7�o�v� ��{ANGr ORDER i�0. J, , Proj . 75-9 <br />��'�" 6ismark Avenue watermain Extension <br />OEP� HEQD APPROVAL. <br />� U�� <br />tvtGR. REVIEWEa/RECflitAME�IDS_ <br />�n September 75, 1975, the city entered into a contract w��h Ro-So Contracting <br />Company to construct a v��atermain ftrom Western Avene�e to Auer6ach, thereby loop- <br />ing the exzsting deadend watermains on Nand and Auerbach Avenues. In drafting <br />the p7ans of this project, the staff rel7ed upon asb�i7t drawings of what was <br />a1readyin place. Ti was faund, upon malcing tneir init�al excavatian, that the <br />existzng 20" watermain that was to be connected to was actuall.y construct�d <br />beyond the point that it was thought to have been ended at. This necessita�ed <br />the contractor to spend approximately 2 hours in labor and eq�ipmen� costs looEc= <br />ing for the watermain. They also installed anath�r 8" vaive and ualve box. <br />The total cost for this work and mater�ai was �566.48. <br />The city staff has review�d this Change �r�er and have 'Found it to be in order. <br />RECOMh1�idDEp ACTION: <br />Approval of Change Order i�a. 7 for Prpject 75--9 to Ro=So Contracting Company <br />in t�e amaunt of $566.48. <br />c <br />