Laserfiche WebLink
ME�r�rvc 1/2b/7� <br />������� ��� �'���:����... �,����� oarE: <br />AGF" -'A S�CTI�N: ORIGINATING DcPi_/DtV.: <br />q <br />i:E%utC�S �;�D RECOi�l�lEilDr�`f I0�15 �'UELIC ;lt7�'.i:S <br />ETEr,� NO.: iTEM a�scRipr�o�v: CHANGE ORD�R �i0. 4, �'IRE S�ATI01`� 1V0. 3 <br />��� Project P�-74-30 <br />c <br />DEPT. H�AD APPF20VAL. <br />v �� <br />MGR. REVIE4YED/RECd�1AMENDS: <br />The fire station consiructian 7s nearly com�7ete, but it has been found that <br />on ti�e up�er floor, as you a�proach the work area fram the stairway, the <br />double T roof section is completely ex�os�d, rather than �eing covered or <br />unclosed in sa►ne manrier. This condition, whiie not unsafe �r structurally <br />unsound, is unsightly and detracts from ��e esthe�ies o'F the building. The <br />city sta�f, therefore, r�quested the architects ta obtain a price from the <br />contractor for enclasing the ends of ihese doub�e i's to �mpr�ove t�e esthetics <br />of -the bui i di ng. Thi s pri ce e�ras obtai ned and i s i denti fi ed as F� el d Qrder� �4 <br />at an ad�ed cost of $172.50. This wauld bring the total changes approved in <br />the contract to date of $857.30 witn deductions ap�roved to date of $1,781.00 <br />or an ac�ua7 reduction in contract price to date of $923.70 to a new tp�al con- <br />tract of $270,727.30. <br />The building is an��cipa�ed ta be ready for occupan�y on �eb. �, so�a speedy <br />decision �n this m�tter is v�ry important. <br />P.ECOiY1���iJDED ACTION: Approval of Change Order �Ifl. 4 on Fi r� Station P�a. 3 <br />identified as Project M-74-30, in�th� amour�t of an added <br />$172.50 for enc�osing doubi� T's on the upper leve�. <br />