My WebLink
|
Help
|
About
|
Sign Out
Home
1976_0315_CC_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1976
>
1976_0315_CC_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:42:30 AM
Creation date
2/24/2012 4:08:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD ORQER N�. 14 continued <br />3/15/76 <br />Item No. 9 $3,014,79 <br />Add 4 smake detectors to the ventilation system so as to shUt down the fans <br />on sensing of smoke in the building. The coae calls for fan shutdown on a ternpera- <br />ture r�s� which waS omitted fro� the plan. The engineers and the city staff felt <br />the smoke d�tection was much be�ter. We, therefore, went �o ihis type of detection. <br />Item �o. 12 $3i1.37 <br />Revise cei ing eight in Raoms 112 and I39, The ceilings had �o be 1awered <br />after ins�allation in Room i39 and instali a soffett in Room 112. This was required <br />to accamodate ducts passing through the rOQm. Architect's oversight. <br />Item Pdo. 13 �2i6.43 <br />Insta lock on court room door. ihis was a request bv the awners. <br />Item �do. 15 63.i3 <br />insta plastic egg crate �n ceilinq af Room 710. 7his was needed for return <br />a7r zn the ventilation system. This was an archit�c�'s oversight during p�an develop- <br />ment. <br />Item No. i6 $453.68 <br />Ins�all water heater flue directly inta stack. The pians ca�led for flue <br />to be installed in the bo�le�^ breaching. With the short breaching, develaped by <br />the construction, the engineer decided f� would create fumes in the building if we <br />Ieft it this way. We m�st insta�l the water heater flue directly in the stack. <br />Item No. 77 $299.60 <br />Increase roof guarantee frpm 5 years to 14 years. The staff felt this cost <br />was very reasonable far this guarantee. This is owner's request. <br />Item F�o. 13 $204.37 <br />nsta enc osure around 7adder to ro4f �o air ventilation in this room. <br />This was an oversight at plan deve7o�ment. <br />Item �do. 19 $133.75 <br />Relocate dark roam light f�xture. These fixtures were not arranged as gliven <br />to ti�e architect ori�ina71y in d�sign phase. <br />7he total added cost for Bu7letin �Va. 8 is $6,636.43. <br />TF�is Fie1d Order wii� be 'Followed up with an offfcial Change Order iater, but �everal <br />of these items must be completed at anc� or we cannot occupy the building. <br />R�COME�fEI�DED AC7TON: Approvai of Fi el d Order �Jo . i 4 for the Ci ty Hal l, contai ni ng <br />Items from Bulletin PJo. 6 and �Jo. 8. Inc1uded in �ulletin �Jo. 6 <br />are Items iJo. 1 an� 5 at a total added cos� of �1,577.i9 and, <br />Bull�tin �Jo. 8, Items 2, 2, 5, 6, 7, 8, 9, 12, 13, 15, 16, 17, <br />18 and 19 at an added cost of �6,63fi.43. <br />The total added cos� of both bulletins combined is $8,213.62. <br />
The URL can be used to link to this page
Your browser does not support the video tag.