My WebLink
|
Help
|
About
|
Sign Out
Home
1976_0315_CC_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1976
>
1976_0315_CC_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 11:42:30 AM
Creation date
2/24/2012 4:08:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEETING 3/15/76 <br />REQUEST FOR COUNCIL ACTION DATE: <br />AGENDA SECTION: ORIGINATING DEPT./DIV.: DEPT. HEAD APPROVQL. <br />REPORTS & R�C�NiNtEPJDATIOP! PUBLIC WORKS �. �� <br />17EM NO.: ITEM d�scRiPrian�: FZELD ORDER PaO. I4 O�V BULLETI�VS �JO. F? IIi S MGR. REVIEWED/RECOMMENDS: <br />�—� FQR CITY HALL, PR�JJECT f�-i4-29 <br />Changes and alterations cantinue to ro31 in on the city hall. The followinn are <br />several changes to the building which have been received from the contractor afiter <br />beinq reques�ed by the architect in Su�letins CJa. 6 and ya. S, �1ost af t�ese are <br />the resu7t of omission or corrections to the orZginal plans arid should b� handled <br />by attaching the disciaimer to the archiiect at the time of the Change Order approval. <br />B[lLLE7ifd iJO. 6 <br />item No. 1 $796.08 <br />Cnange �he w re size leading ta motors 19, 24 and 21 from individual dis� <br />connects and wire, to one feed with one discannect. The disconnect and ��ire size <br />was much larg�r, beca�se t}�e air-cooled candensor came with fac�ary-synchronized <br />wire io the 3 motars, raiher than individually fed, Architects electrical anci <br />mechanical des��ns r�at compatable. <br />Item i�aa. 5 $781.11 <br />Add thermostats for ur�it heaters in carridor 116, stair � and Room 748. <br />Ti�ese were ami �ted on the pI an . <br />�he total added cost for Bulletin P�o. 6 is $1,577.19. <br />BIJLLETTN N0. 8 <br />Item fdo. 1 $512.53 <br />Instali exhaust fan in electrical room. In an extended power failure, the <br />raom in which the emergency generator i�-�installed would get too hot. This was not <br />shown on the pian. An oversight of the archit�cts. <br />-� � Item PJo. 2 $559.61 <br />Insta a ' x 12" combustion air duci ta the raof. The combustion air is <br />for the operation af ihe boiZer, the hat water heater and the emergency generator. <br />Tne arrangement of this i�ad to be revised from the ariqinally specified on plan. <br />It�m f�io. 5 $321.�0 <br />Revise exit light fixtur�. The fixture specified was toa high to �it above <br />the doors, so they had to be exehanged. Architect's oversight. <br />Item P�a. 6 & 7 �310.30 <br />evTSe corr� �r zght fixtures in main corridor. �our light fixtares had <br />to be changed from 4' florescent �#xtures ta 3' fixtures. The origir�al layout was <br />for two 3' fixtures and one �' fixture in a row acrass the corridor. The space �ras <br />too short for this arrangement so the 4' fixtures v�tere exchanged for a 3' fixture. <br />Architect's overs7gnt. <br />Item Na. 8 $23b.47 <br />Add twist-lock receptacle in telephone equipment room. Nt�J Be11 needed a <br />speciai circuit run from the emergency panel to operate their equipr�ent. Th�s equip- <br />ment was nat known at the time the p7ans were drawn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.