My WebLink
|
Help
|
About
|
Sign Out
Home
1975_1229_CC_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1975
>
1975_1229_CC_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2014 2:44:40 PM
Creation date
2/28/2012 3:20:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA S�CTION: <br />� �RTS AiID RECO°�lllEiJDATICi�tS <br />�����+7� ��� ����'�+�� H��i�� <br />ORIGIfVATING DEPT./QIV.: <br />PI��LIC id�P.i�S <br />MEETING Z� �9 <br />DATE: � � 75 <br />DEPT.HEAD APPROVAL. <br />�. U.�f <br />1TEM NO.: ITEM DESCRlP710N: MGR. REVIEWEO/RECOMMEN�S: <br />�,�- � WATER SYSTEM R�PORT, PROJECT YJ-74-19 �� <br />The council prev�ousiy au�horized a study to update the r�eeds af the cit.y's <br />wafier system. This study was to be un�ertafcen by the consulting firm of <br />Banister, 5i�ort, Eiliott, Nendrickson and Associates,and to review the <br />averall syst�m and indicate actians to be taken thraugh the period of t�e 1970's. <br />This study has now been completed and �s submitted for your review. Of special <br />note on the�points broughi out is that the city is already experiencing some <br />problems in supplying neeessary volumes of water during peak usage days and the <br />fact that the system requires an additional main to �rovide water without abnarmai <br />pressure losses. Other items indicated are th� need far a backup source of power <br />to operat� the pumping station and some stii1 remaining missing links in the <br />overall distribut�on sys�em. <br />Roger Shori will be on hand at the Dec. 29 meeting to g�ve a short explanation <br />of the study and point out �ts ramifications. If ��ou have any questions before <br />the time of the meeting, however, feel free to contact rr�e and/or Mr. Short. <br />S�ecif�c consideration of individua7 improv�ments nated in the study urill be <br />reviewed on an item--by-item basis as the needs arise. Qecause of the curren� <br />situation, the addition of additional pumping facil�ties and addition of trans- <br />mis5ion mains will be pr�sented in another item at �h-1s same rr�eeting for your <br />rev� ew. <br />RECOMf=1EPdD�D ACTI4N: Receipt of the 4va�er study report for system needs <br />thraugh the 197Q's carryirtg our identification <br />f�a, 1�-74-I9 for review and considerat�on. <br />attc; report <br />
The URL can be used to link to this page
Your browser does not support the video tag.