Laserfiche WebLink
�p°°�''s�j�'+�+��,� �g +�� DATE: ��9�75 <br />���L��� i ���'L 1.+��,.9$���� �� 1 ��7� <br />AGENbA SECTiO(d: ORIGINAiING DEP7./D1V.: <br />R�PQRTS R� RECO�°i��EE•�DATI���S PUGLIC :J�RKS <br />IT�' NQ.: 17EM DESCRIPTION' <br />�_ J rp STREEi DEPARTi�9Ei�f ASPNE�LT t�r'�TE�I�IL �IDS <br />DEP�. �-lEAD APAROVAL. <br />� v �'f <br />MGR. F3�VIEV�iED/R£COMi+AE�IpS: <br />Earli�r this month, the cit�� received bids for �his year's sup�ly Qf s�reet depart- <br />ment �lacktop pa�ching r�aterials. At that tir,ie, fnur bids �rer� received and are as <br />fol l o��rs : D�1 i vered Total ,�lrnount F'i cked up Tota7 �mt. <br />Rsl�back Constructian Co. $10.5t�/ton �73,5�10 � 9.1�/ton �63,7�� <br />F-iidt��est l�sphalt Corporati�n <br />�-Tu-�9ix Com�any <br />7. A. Schifsky � Sans, Inc. <br />7.1.25/ton 75,750 <br />16.50/ion ll5,a�}� <br />10.99/ton 76,930 <br />10.25/t�n 71,750 <br />8.50/t�n 5�,50� <br />9.84/ton 68,�(l0 <br />It has t�een de��rmir�ed that it is -in the city's best interest to use ti�e �ickun �rice <br />and go to ihe plant ourselves, rather than have the materials delivered and ►�ait, a� <br />vari ous ti mes , for t��i s dei i very. ��e have �1 so analyzed tl�e cos t for gai nc� ta pi ck <br />up �his material and it was found that the lovaest bid t�ras from Ashbach Construction. <br />Company, in,the amount of �9.10 p�r ton picic�d u�. Another firm, 6-Tu-Mix in Hapkins, <br />had a lal�t�er•price per tan, but the costs were excessive becau�e of the lonqer distanee <br />af hav�ng �o drive to picic up the materiai. <br />Recommend�d act�on: A�praval of Ashbac3� Cons�ruction Company of 5t. Paul for the <br />supply of street ma�erial blacktop for 1975 in the ar�ount af <br />�9.10 �er ton pi ciced up. <br />